Wide Angle Baffle at IYC

<< <  2018 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2018 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30    

<< <  2018 / 12 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

<< <  2019 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

||

<< <  2021 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        
|

Task list

Note: some of the tasks can be done in parallel.

Pin Assignment

P23, to be connected to Cryocon#7 E and F in this order respectively.

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

A

75 ohm

Thermometer S/N#2564

V-

Green

WAB

B

75 ohm

Thermometer S/N#2564

V+

Black

WAB

C

4 ohm

Thermometer S/N#2564

I-

Red

WAB

D

4 ohm

Thermometer S/N#2564

I+

Yellow

WAB

E

75 ohm

Thermometer S/N#360

V-

Green

Structure

F

75 ohm

Thermometer S/N#360

V+

Black

Structure

G

4 ohm

Thermometer S/N#360

I-

Red

Structure

H

4 ohm

Thermometer S/N#360

I+

Yellow

Structure

Note that the pin arrangement (or the naming) is mirrored compared with that of in IXC! Rather, I guess this IXC's would be correct.

KAGRA/subgroup/AOS/WideAngleBaffleIY (last edited 2021-03-03 18:14:28 by TomotadaAkutsu)