Differences between revisions 2 and 6 (spanning 4 versions)
Revision 2 as of 2019-01-09 20:28:47
Size: 2537
Comment:
Revision 6 as of 2021-03-03 18:14:28
Size: 2743
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
||<<MonthCalendar(,2021,3)>>|
Line 34: Line 35:
P23 P23, to be connected to Cryocon#7 E and F in this order respectively.
Line 36: Line 37:
||A||75 ohm|| Thermometer || V- || Green || || ||
||B||75 ohm|| Thermometer || V+ || Black || || ||
||C||4 ohm|| Thermometer || I- || Red || || ||
||D||4 ohm|| Thermometer || I+ || Yellow || || ||
||E||75 ohm|| Thermometer || V- || Green || || ||
||F||75 ohm|| Thermometer || V+ || Black || || ||
||G||4 ohm|| Thermometer || I- || Red || || ||
||H||4 ohm|| Thermometer || I+ || Yellow ||  || ||
||A||75 ohm|| Thermometer S/N#2564|| V- || Green || WAB || ||
||B||75 ohm|| Thermometer S/N#2564|| V+ || Black || WAB || ||
||C||4 ohm|| Thermometer S/N#2564|| I- || Red || WAB || ||
||D||4 ohm|| Thermometer S/N#2564|| I+ || Yellow || WAB || ||
||E||75 ohm|| Thermometer S/N#360|| V- || Green || Structure || ||
||F||75 ohm|| Thermometer S/N#360|| V+ || Black || Structure || ||
||G||4 ohm|| Thermometer S/N#360|| I- || Red || Structure || ||
||H||4 ohm|| Thermometer S/N#360|| I+ || Yellow || Structure || ||

Wide Angle Baffle at IYC

<< <  2018 / 10 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2018 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30    

<< <  2018 / 12 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

<< <  2019 / 1 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

||

<< <  2021 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        
|

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension

  • Align the position of WAB -> take WAB back to nominal position, put off protectors)

    • horizontal alignment

    • yaw alignment

  • Move it to the saving mode.

  • Back to the nominal position.

  • Attach heat links

    • 4 soft heat links to WAB

    • 1 heat link btwn the top and the structure

  • Attach 2 thermometers

  • Set revised blocks under the base plate.

Pin Assignment

P23, to be connected to Cryocon#7 E and F in this order respectively.

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

A

75 ohm

Thermometer S/N#2564

V-

Green

WAB

B

75 ohm

Thermometer S/N#2564

V+

Black

WAB

C

4 ohm

Thermometer S/N#2564

I-

Red

WAB

D

4 ohm

Thermometer S/N#2564

I+

Yellow

WAB

E

75 ohm

Thermometer S/N#360

V-

Green

Structure

F

75 ohm

Thermometer S/N#360

V+

Black

Structure

G

4 ohm

Thermometer S/N#360

I-

Red

Structure

H

4 ohm

Thermometer S/N#360

I+

Yellow

Structure

Note that the pin arrangement (or the naming) is mirrored compared with that of in IXC! Rather, I guess this IXC's would be correct.

KAGRA/subgroup/AOS/WideAngleBaffleIY (last edited 2021-03-03 18:14:28 by TomotadaAkutsu)