MIF Meeting Minutes 2012/7/17
Decisions
The task assignment was decided as follows:
- LSC ASC Overall Design (Aso, Michimura, (Nakano ?))
- Frequency Stabilization Servo (Ando)
- Green Lock System (Tatsumi, Ueda)
- RTS code implementation(Miyakawa)
- Commissioning Planning (Aso)
- Electronics Circuit Design (Aso)
Vacuum Enclosure & Wiring for In-Vac PDs (Akutsu, Yamamoto)
- PD Protection Shutter (Somiya, Akutsu)
- Beam handling during All-In-Vac operation (Akutsu)
- Output Mode Cleaner (Somiya, Michimura, Arai)
See KAGRA/Subgroups/MIF/TaskList for more details.
Next meeting
Proposed date: 8/7(Tue) 13:30 - 14:30 (To be fixed)
Agenda: Progress reports of the tasks.