See [[KAGRA/Subgroups/MIF/TaskList]] for more detail. See [[KAGRA/Subgroups/MIF/TaskList]] for more details.

== Next meeting ==
Proposed date: 8/7(Tue) 13:30 - 14:30 (To be fixed)

Agenda: Progress reports of the tasks.

MIF Meeting Minutes 2012/7/17

Decisions

The task assignment was decided as follows:

  • LSC ASC Overall Design (Aso, Michimura, (Nakano ?))
  • Frequency Stabilization Servo (Ando)
  • Green Lock System (Tatsumi, Ueda)
  • RTS code implementation(Miyakawa)
  • Commissioning Planning (Aso)
  • Electronics Circuit Design (Aso)
  • Vacuum Enclosure & Wiring for In-Vac PDs (Akutsu, Yamamoto)

  • PD Protection Shutter (Somiya, Akutsu)
  • Beam handling during All-In-Vac operation (Akutsu)
  • Output Mode Cleaner (Somiya, Michimura, Arai)

See KAGRA/Subgroups/MIF/TaskList for more details.

Next meeting

Proposed date: 8/7(Tue) 13:30 - 14:30 (To be fixed)

Agenda: Progress reports of the tasks.