Differences between revisions 1 and 2
Revision 1 as of 2012-10-09 18:24:00
Size: 47
Editor: YoichiAso
Comment:
Revision 2 as of 2012-10-10 22:46:56
Size: 1389
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
  Date, Time, Place: 2012/10/9 13:30 - 15:00 on EVO

Participants: Aso, Arai, Somiya, Shibata, H. Yamamoto, Akutsu, Ando, Miyakawa, R. Takahashi

=== Decided ===

 KAGRA OMC Development Strategy

 * A proof-of-concept style prototype experiment will be conducted at TITEC (Somiya group)
 * At the same time, Arai-san will develop a production OMC for LLO this year.
 * Someone from KAGRA (most likely Michimura-kun) will be involved in the process to gain knowledge of aLIGO OMC.
 * Based on the aLIGO OMC design, we will design KAGRA OMC.
 * This OMC will be tested somewhere (to be decided) under vacuum with full digital control and suspended steering mirrors.
 * The intention of the above test is to gain experience in the KAGRA team of operating OMC. We will use a small Michelson
to mimic the KAGRA interferometer.

Coordination of Interferometer Related Experiments

 * It is time to coordinate interferometer related experiments, including but not limited to prototype and first article tests, within the KAGRA group.
 * Y. Aso will make a draft of a who-does-what list.
 * Circulation of the list shall start a discussion via email
 * Y. Aso will organize a face-to-face meeting on this issue at an appropriate time (likely to be in early November)

=== Next Meeting ===

 * Oct. 23 (Tue) 13:30 - 14:30 on EVO

Minutes of the MIF Meeting 2012/10/9

Date, Time, Place: 2012/10/9 13:30 - 15:00 on EVO

Participants: Aso, Arai, Somiya, Shibata, H. Yamamoto, Akutsu, Ando, Miyakawa, R. Takahashi

Decided

  • KAGRA OMC Development Strategy
  • A proof-of-concept style prototype experiment will be conducted at TITEC (Somiya group)
  • At the same time, Arai-san will develop a production OMC for LLO this year.
  • Someone from KAGRA (most likely Michimura-kun) will be involved in the process to gain knowledge of aLIGO OMC.
  • Based on the aLIGO OMC design, we will design KAGRA OMC.
  • This OMC will be tested somewhere (to be decided) under vacuum with full digital control and suspended steering mirrors.
  • The intention of the above test is to gain experience in the KAGRA team of operating OMC. We will use a small Michelson

to mimic the KAGRA interferometer.

Coordination of Interferometer Related Experiments

  • It is time to coordinate interferometer related experiments, including but not limited to prototype and first article tests, within the KAGRA group.
  • Y. Aso will make a draft of a who-does-what list.
  • Circulation of the list shall start a discussion via email
  • Y. Aso will organize a face-to-face meeting on this issue at an appropriate time (likely to be in early November)

Next Meeting

  • Oct. 23 (Tue) 13:30 - 14:30 on EVO

KAGRA/subgroup/ifo/MIF/Minutes20121009 (last edited 2012-10-10 22:47:51 by YoichiAso)