Differences between revisions 3 and 4
Revision 3 as of 2012-10-10 22:47:10
Size: 1388
Editor: YoichiAso
Comment:
Revision 4 as of 2012-10-10 22:47:33
Size: 1407
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 KAGRA OMC Development Strategy ==== KAGRA OMC Development Strategy ====
Line 18: Line 18:
Coordination of Interferometer Related Experiments ==== Coordination of Interferometer Related Experiments ====

Minutes of the MIF Meeting 2012/10/9

Date, Time, Place: 2012/10/9 13:30 - 15:00 on EVO

Participants: Aso, Arai, Somiya, Shibata, H. Yamamoto, Akutsu, Ando, Miyakawa, R. Takahashi

Decided

KAGRA OMC Development Strategy

  • A proof-of-concept style prototype experiment will be conducted at TITEC (Somiya group)
  • At the same time, Arai-san will develop a production OMC for LLO this year.
  • Someone from KAGRA (most likely Michimura-kun) will be involved in the process to gain knowledge of aLIGO OMC.
  • Based on the aLIGO OMC design, we will design KAGRA OMC.
  • This OMC will be tested somewhere (to be decided) under vacuum with full digital control and suspended steering mirrors.
  • The intention of the above test is to gain experience in the KAGRA team of operating OMC. We will use a small Michelson to mimic the KAGRA interferometer.

  • It is time to coordinate interferometer related experiments, including but not limited to prototype and first article tests, within the KAGRA group.
  • Y. Aso will make a draft of a who-does-what list.
  • Circulation of the list shall start a discussion via email
  • Y. Aso will organize a face-to-face meeting on this issue at an appropriate time (likely to be in early November)

Next Meeting

  • Oct. 23 (Tue) 13:30 - 14:30 on EVO

KAGRA/subgroup/ifo/MIF/Minutes20121009 (last edited 2012-10-10 22:47:51 by YoichiAso)