Line 12: Line 12:
 * ISC Task List 2015 (Updated after the meeting)
http://www.evernote.com/l/AGHCMq59o25EKK0TsfE3RgA6FfhobJlq7QE/
==== Comments ====
 * iKAGRA commissioning:
  * Need to be prepared befoe starting the commissioning.
  * We should make a noise budget model beforehand.
  * Also we should perform necessary measurements (such as PD dark noise) as much as possible beforehand.
 * IBF: Only considering the power reduction of the RFSB is not enough. We should estimate the actual impacts on the loop noise, ASC, etc. We should check with Hirose-san how much assymmetry between X and Y arms were introduced with his simulations. Also

Minutes of ISC Meeting on 2015/7/27

14:00 - 15:00 on SeeVogh

Participants: Aso, Miyakawa, Kokeyama, Somiya, Arai, H. Yamamoto, Ueda, Nakano, Akutsu, Michimura

Agenda

  1. Review the task list again
  2. Confirmation of available man power

Discussions

Review of the task list again

  • ISC Task List 2015 (Updated after the meeting)

http://www.evernote.com/l/AGHCMq59o25EKK0TsfE3RgA6FfhobJlq7QE/

Comments

  • iKAGRA commissioning:
    • Need to be prepared befoe starting the commissioning.
    • We should make a noise budget model beforehand.
    • Also we should perform necessary measurements (such as PD dark noise) as much as possible beforehand.
  • IBF: Only considering the power reduction of the RFSB is not enough. We should estimate the actual impacts on the loop noise, ASC, etc. We should check with Hirose-san how much assymmetry between X and Y arms were introduced with his simulations. Also