Differences between revisions 4 and 6 (spanning 2 versions)
Revision 4 as of 2016-01-12 14:05:29
Size: 702
Editor: YoichiAso
Comment:
Revision 6 as of 2016-01-18 06:46:48
Size: 2321
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
14:00 - 15:00 on !SeeVogh 14:00 - 15:00 on SeeVogh
Line 4: Line 4:
Participants:Michimura, Yamamoto (H), Aso

== Agenda ==
 1. iKAGRA interferometer configuration change (Aso) [[https://www.dropbox.com/s/4qa0fv6tgz2wnxt/CLIO-TAMA-KAGRA3000.pdf?dl=0|Slides]]
 1. Requests for coating requirements from LMA
  * Quotation status (Hirose)
Participants: Michimura, H. Yamamoto, K. Arai, Aso, Akutsu
Line 12: Line 7:
  * RFPD/QPD (Aso, Doi)
Line 14: Line 8:
  * Site installation work schedule
   * We will make a task list. Then assign tasks to people and arrange the schedule.
   * Michimura will make a task list.
  * RFPD/QPD (Aso, Doi): Waiting for delivery
  * RF Distribution Amp assembled by Nakano on Dec 16, 2015
   * http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4744
  * All the iKAGRA ISC chassis (minimum set) are assembled
Line 18: Line 13:
 1. Magnet Noise (Michimura)  1. iKAGRA electronics tasklist
 * RF PD
  * assembly (Aso, Doi)
  * test, tune resonances (?)
Line 20: Line 18:
 1. OMC (Somiya)    * Cable assembly
  * RF low loss cables with N connectors
   * For short (less than 10m) cables, will not use the semi-rigid low-loss cables. Ask a company to make a bunch of flexible coaxial cables with N connectors (and some long SMA cables).
  * Diff-to-single cables: Only 2 of them are needed. Make them as a part of installation work.
  * we have purchased all the other ISC cables
Line 22: Line 25:
 1. FFT Simulation (Hirose, H. Yamamoto)  * Cabling
  * IMC ASC related (Nakano, U-Toyama students?)
  * REFL related (Michimura, Ando-lab students)
  * IMMT1T(RFPD,DCQPDx2) related (Michimura, Ando-lab students)
  * We have decided not to use IMMT2T in the IOO meeting

 * Magnet noise
  * SmCo 2mm dia, 3mm thick for BS TM is OK
  * magnetic noise from TM: ~1/18 of the displacement noise requirement at 10 Hz
  * DAC output at lock acquisition for TM: ~630 counts
  * SmCo 10mm dia, 10mm thick for BS IM (no change in size)
  * Magnetic noise from IM: ~1/20 of the displacement noise requirement at 10Hz
  * DAC output during lock for IM: ~3425 counts RMS

  * See JGW-T1504450 for the summary of the discussion (includes the discussion for SRs and PRs)
   * http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4450

 1. FFT simulation (H. Yamamoto, Hirose)
  * Need transmission data of ETM. What is the status of delivery ?
  * H. Yamamoto will prepare the simulation code so that once the data is available, we can quickly check the requirements on the ITM polishing.

 1. Initial Alignment of iKAGRA.
  * How to send the beam to the end at 3km away ?
   * Automatically scan the beam direction using PR3 (for X arm) and check for flashes on the ETM suspension using a video camera.
   * Automation of the above process is an interesting project for students

ISC Meeting on 2016/1/12

14:00 - 15:00 on SeeVogh

Participants: Michimura, H. Yamamoto, K. Arai, Aso, Akutsu

  1. Electronics Preparation Status (Michimura, Aso)
  2. iKAGRA electronics tasklist
  3. RF PD
    • assembly (Aso, Doi)
    • test, tune resonances (?)
  4. Cable assembly
    • RF low loss cables with N connectors
      • For short (less than 10m) cables, will not use the semi-rigid low-loss cables. Ask a company to make a bunch of flexible coaxial cables with N connectors (and some long SMA cables).
    • Diff-to-single cables: Only 2 of them are needed. Make them as a part of installation work.
    • we have purchased all the other ISC cables
  5. Cabling
    • IMC ASC related (Nakano, U-Toyama students?)
    • REFL related (Michimura, Ando-lab students)
    • IMMT1T(RFPD,DCQPDx2) related (Michimura, Ando-lab students)
    • We have decided not to use IMMT2T in the IOO meeting
  6. Magnet noise
    • SmCo 2mm dia, 3mm thick for BS TM is OK

    • magnetic noise from TM: ~1/18 of the displacement noise requirement at 10 Hz
    • DAC output at lock acquisition for TM: ~630 counts
    • SmCo 10mm dia, 10mm thick for BS IM (no change in size)

    • Magnetic noise from IM: ~1/20 of the displacement noise requirement at 10Hz
    • DAC output during lock for IM: ~3425 counts RMS
    • See JGW-T1504450 for the summary of the discussion (includes the discussion for SRs and PRs)
  7. FFT simulation (H. Yamamoto, Hirose)
    • Need transmission data of ETM. What is the status of delivery ?
    • H. Yamamoto will prepare the simulation code so that once the data is available, we can quickly check the requirements on the ITM polishing.
  8. Initial Alignment of iKAGRA.
    • How to send the beam to the end at 3km away ?
      • Automatically scan the beam direction using PR3 (for X arm) and check for flashes on the ETM suspension using a video camera.
      • Automation of the above process is an interesting project for students
  9. Next meting 2016/1/25

KAGRA/subgroup/ifo/MIF/Minutes20160112 (last edited 2016-01-18 06:46:48 by YoichiAso)