⇤ ← Revision 1 as of 2016-04-17 04:59:17
Size: 30
Comment:
|
Size: 612
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2016/4/18 14:00 - 15:00 Participants: 1. What to do just after the iKAGRA test run. * Save and note all the interferometer settings, configurations to write a paper * Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor. * oplev stability, noise measurements (with mirror fixed) * scattering noise investigation * measure PR3 suspension Q values 2. Planning towards bKAGRA [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/TaskList|ISC Task List]] 3. Status of the simulation for the ITM spec. |
ISC Meeting on 2016/4/18
2016/4/18 14:00 - 15:00
Participants:
1. What to do just after the iKAGRA test run.
- Save and note all the interferometer settings, configurations to write a paper
- Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
- oplev stability, noise measurements (with mirror fixed)
- scattering noise investigation
- measure PR3 suspension Q values
2. Planning towards bKAGRA
3. Status of the simulation for the ITM spec.