2016/4/18 14:00 - 15:00

Participants:

1. What to do just after the iKAGRA test run.

 * Save and note all the interferometer settings, configurations to write a paper
 * Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
 * oplev stability, noise measurements (with mirror fixed)
 * scattering noise investigation
 * measure PR3 suspension Q values

2. Planning towards bKAGRA

[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/TaskList|ISC Task List]]

3. Status of the simulation for the ITM spec.

ISC Meeting on 2016/4/18

2016/4/18 14:00 - 15:00

Participants:

1. What to do just after the iKAGRA test run.

  • Save and note all the interferometer settings, configurations to write a paper
  • Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
  • oplev stability, noise measurements (with mirror fixed)
  • scattering noise investigation
  • measure PR3 suspension Q values

2. Planning towards bKAGRA

ISC Task List

3. Status of the simulation for the ITM spec.