Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2016-04-17 04:59:17
Size: 30
Editor: YoichiAso
Comment:
Revision 5 as of 2016-04-18 15:48:49
Size: 1458
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2016/4/18 14:00 - 15:00

Participants: Miyakawa, Aso, Nakano, Ando, Arai, H. Yamaoto, Michimura

1. What to do just after the iKAGRA test run.

 * Save and note all the interferometer settings, configurations to write a paper
 * Calibration confirmation, actuator efficiency measurement
 * Can we measure the Schnupp asymmetry somehow ?
 * Stop the clean booth filters and see if the noise changes
 * Take noise spectra using an analog FFT analyser up to very high frequency. Compare it with the spectrum taken by the digital system.
 * Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
 * oplev stability, noise measurements (with mirror fixed)
 * scattering noise investigation
 * measure PR3 suspension Q values

2. Planning towards bKAGRA

[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/MIF/TaskList|ISC Task List]]

A possibility of operating a room temperature

ディジタルでも,アナログ回路の設計を行うのと同じようなつもりで,設計をしておく。 Simulated Plant -> 次のリリースではハード無しで動かせる?

PR3-PR2長の確認。PRCのGouy Phaseを測った?

公式干渉計モデルを作る?

OMCはまずはメタルで作る? キックオフミーティング?

2018年bKAGRA用とそれ以降用は分けて考える。

3. Status of the simulation for the ITM spec.

ISC Meeting on 2016/4/18

2016/4/18 14:00 - 15:00

Participants: Miyakawa, Aso, Nakano, Ando, Arai, H. Yamaoto, Michimura

1. What to do just after the iKAGRA test run.

  • Save and note all the interferometer settings, configurations to write a paper
  • Calibration confirmation, actuator efficiency measurement
  • Can we measure the Schnupp asymmetry somehow ?
  • Stop the clean booth filters and see if the noise changes
  • Take noise spectra using an analog FFT analyser up to very high frequency. Compare it with the spectrum taken by the digital system.
  • Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
  • oplev stability, noise measurements (with mirror fixed)
  • scattering noise investigation
  • measure PR3 suspension Q values

2. Planning towards bKAGRA

ISC Task List

A possibility of operating a room temperature

ディジタルでも,アナログ回路の設計を行うのと同じようなつもりで,設計をしておく。 Simulated Plant -> 次のリリースではハード無しで動かせる?

PR3-PR2長の確認。PRCのGouy Phaseを測った?

公式干渉計モデルを作る?

OMCはまずはメタルで作る? キックオフミーティング?

2018年bKAGRA用とそれ以降用は分けて考える。

3. Status of the simulation for the ITM spec.

KAGRA/subgroup/ifo/MIF/Minutes20160418 (last edited 2016-04-25 10:10:50 by YoichiAso)