Size: 612
Comment:
|
Size: 1458
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
Participants: | Participants: Miyakawa, Aso, Nakano, Ando, Arai, H. Yamaoto, Michimura |
Line 9: | Line 9: |
* Calibration confirmation, actuator efficiency measurement * Can we measure the Schnupp asymmetry somehow ? * Stop the clean booth filters and see if the noise changes * Take noise spectra using an analog FFT analyser up to very high frequency. Compare it with the spectrum taken by the digital system. |
|
Line 18: | Line 22: |
A possibility of operating a room temperature ディジタルでも,アナログ回路の設計を行うのと同じようなつもりで,設計をしておく。 Simulated Plant -> 次のリリースではハード無しで動かせる? PR3-PR2長の確認。PRCのGouy Phaseを測った? 公式干渉計モデルを作る? OMCはまずはメタルで作る? キックオフミーティング? 2018年bKAGRA用とそれ以降用は分けて考える。 |
ISC Meeting on 2016/4/18
2016/4/18 14:00 - 15:00
Participants: Miyakawa, Aso, Nakano, Ando, Arai, H. Yamaoto, Michimura
1. What to do just after the iKAGRA test run.
- Save and note all the interferometer settings, configurations to write a paper
- Calibration confirmation, actuator efficiency measurement
- Can we measure the Schnupp asymmetry somehow ?
- Stop the clean booth filters and see if the noise changes
- Take noise spectra using an analog FFT analyser up to very high frequency. Compare it with the spectrum taken by the digital system.
- Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
- oplev stability, noise measurements (with mirror fixed)
- scattering noise investigation
- measure PR3 suspension Q values
2. Planning towards bKAGRA
A possibility of operating a room temperature
ディジタルでも,アナログ回路の設計を行うのと同じようなつもりで,設計をしておく。 Simulated Plant -> 次のリリースではハード無しで動かせる?
PR3-PR2長の確認。PRCのGouy Phaseを測った?
公式干渉計モデルを作る?
OMCはまずはメタルで作る? キックオフミーティング?
2018年bKAGRA用とそれ以降用は分けて考える。
3. Status of the simulation for the ITM spec.