Line 22: Line 22:
A possibility of operating a room temperature

ディジタルでも,アナログ回路の設計を行うのと同じようなつもりで,設計をしておく。 Simulated Plant -> 次のリリースではハード無しで動かせる?

PR3-PR2長の確認。PRCのGouy Phaseを測った?

公式干渉計モデルを作る?

OMCはまずはメタルで作る? キックオフミーティング?

2018年bKAGRA用とそれ以降用は分けて考える。
 * A possibility of operating a room temperature Michelson interferometer at the end of May 2017 is under discussion.
 * How to motivate the development of digital models.
  * It will be good to design the feedback system just like designing analog circuits (not ad hoc development but make a well documented design).
  * The next release of the realtime code may work without actual hardware (ADC/DAC etc). This is a good opportunity to start working on the simulated plant.
 * How to check the length between PR2-PR3 or SR2-SR3. Measuring the Gouy phase ?
 * Simulation work: shall we make official interferometer models (Optickle and Finesse) of KAGRA ?
 * OMC: If the engineering hardle of all-glass OMC is too high, how about making one with metal first ?
  * A kick off meeting is necessary for OMC
 * Items necessary for bKAGRA phase 1 and one for later should be distingished.

ISC Meeting on 2016/4/18

2016/4/18 14:00 - 15:00

Participants: Miyakawa, Aso, Nakano, Ando, Arai, H. Yamaoto, Michimura

1. What to do just after the iKAGRA test run.

  • Save and note all the interferometer settings, configurations to write a paper
  • Calibration confirmation, actuator efficiency measurement
  • Can we measure the Schnupp asymmetry somehow ?
  • Stop the clean booth filters and see if the noise changes
  • Take noise spectra using an analog FFT analyser up to very high frequency. Compare it with the spectrum taken by the digital system.
  • Measure the accurate position of the mirrors (PR3 and BS) with respect to the markings on the floor.
  • oplev stability, noise measurements (with mirror fixed)
  • scattering noise investigation
  • measure PR3 suspension Q values

2. Planning towards bKAGRA

ISC Task List

  • A possibility of operating a room temperature Michelson interferometer at the end of May 2017 is under discussion.
  • How to motivate the development of digital models.
    • It will be good to design the feedback system just like designing analog circuits (not ad hoc development but make a well documented design).
    • The next release of the realtime code may work without actual hardware (ADC/DAC etc). This is a good opportunity to start working on the simulated plant.
  • How to check the length between PR2-PR3 or SR2-SR3. Measuring the Gouy phase ?
  • Simulation work: shall we make official interferometer models (Optickle and Finesse) of KAGRA ?
  • OMC: If the engineering hardle of all-glass OMC is too high, how about making one with metal first ?
    • A kick off meeting is necessary for OMC
  • Items necessary for bKAGRA phase 1 and one for later should be distingished.

3. Status of the simulation for the ITM spec.