Differences between revisions 1 and 2
Revision 1 as of 2016-05-15 05:01:48
Size: 344
Editor: YoichiAso
Comment:
Revision 2 as of 2016-05-16 12:57:41
Size: 433
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * bKAGRA phase 1 optical configuration [Aso]  * bKAGRA phase 1 optical configuration [Aso] [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5199|Slides]]

ISC Meeting on 2016/5/16

2016/5/16 14:00 - 15:00

Participants:

Agenda

  • Swtitch of the chief and sub-chief
  • iKAGRA post-run measurements
    • iKAGRA beam spot positions [Aso]
    • Post run calibration mystery [Aso]
  • bKAGRA phase 1 optical configuration [Aso] Slides

  • Mirror absorption measurement status (if any) [Hirose]

KAGRA/subgroup/ifo/MIF/Minutes20160516 (last edited 2016-05-17 04:55:00 by YoichiAso)