Size: 433
Comment:
|
← Revision 5 as of 2016-05-17 04:55:00 ⇥
Size: 1045
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
Participants: | Participants: Michimura, Miyakawa, Kokeyama, Miyo, H. Yamamoto, Aso |
Line 8: | Line 8: |
* Michimura will become the chief of MIF. Aso will become the sub-chief. | |
Line 9: | Line 10: |
* iKAGRA beam spot positions [Aso] * Post run calibration mystery [Aso] |
* iKAGRA beam spot positions [Aso] [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=1740|klog]] * Post run calibration mystery [Aso] [[https://nbviewer.jupyter.org/urls/dl.dropbox.com/s/co1zf6k306ca0b3/Post-Run%20MICH%20Calibration.ipynb|Notebook]] * Transfer function measurements from single ETM to the MICH error signal shows no LPF. -> excludes the possibility of a hidden LPF in the analog chain. * Differential time delay between ETMX and ETMY could be a cause but not so sure. |
Line 12: | Line 15: |
* Mirror absorption measurement status (if any) [Hirose] | * Moving PR2 and PR3 by 1cm each will stabilize the PRMI * HOM structure and the length sensing signals need to be checked. |
ISC Meeting on 2016/5/16
2016/5/16 14:00 - 15:00
Participants: Michimura, Miyakawa, Kokeyama, Miyo, H. Yamamoto, Aso
Agenda
- Swtitch of the chief and sub-chief
- Michimura will become the chief of MIF. Aso will become the sub-chief.
- iKAGRA post-run measurements
iKAGRA beam spot positions [Aso] klog
Post run calibration mystery [Aso] Notebook
Transfer function measurements from single ETM to the MICH error signal shows no LPF. -> excludes the possibility of a hidden LPF in the analog chain.
- Differential time delay between ETMX and ETMY could be a cause but not so sure.
bKAGRA phase 1 optical configuration [Aso] Slides
- Moving PR2 and PR3 by 1cm each will stabilize the PRMI
- HOM structure and the length sensing signals need to be checked.