Differences between revisions 1 and 25 (spanning 24 versions)
Revision 1 as of 2016-06-15 07:19:04
Size: 2805
Comment:
Revision 25 as of 2016-06-27 15:13:06
Size: 5700
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
eZuce: http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2DDsDe9s9eDs9t
Line 3: Line 4:
eZuce: Participants: Y. Aso, T. Akutsu, H. Yamamoto, K. Kokeyama, O. Miyakawa, Y. Michimura
Line 5: Line 6:
Participants: == Minutes ==
 * bKAGRA Phase 1 analog electronics
  * Quad IQ Demodulator heat-up issue
   * a
   * decide if we need 1st stage amp or not []
Line 9: Line 14:
  * HOM structure / LSC / ASC check -> to be done [Michimura]
  * initiated Optickle 2 modeling: [[https://granite.phys.s.u-tokyo.ac.jp/trac/LCGT/browser/trunk/mif/KAGRAOptickle/bKAGRAPhase1/|KAGRAOptickle SVN]] (login required)
  * Optickle (Optickle2) seminar on July 1 [[http://densuke.biz/list?cd=bNJ9WSPSEQNxheCy|densuke]]
  * HOM structure / LSC / ASC check [Michimura]
   * initiated Optickle 2 modeling: [[https://granite.phys.s.u-tokyo.ac.jp/trac/LCGT/browser/trunk/mif/KAGRAOptickle/bKAGRAPhase1/|KAGRAOptickle SVN]] (login required)
   * Optickle (Optickle2) seminar on July 1 [[http://densuke.biz/list?cd=bNJ9WSPSEQNxheCy|densuke]]
    * announced to Toyama and Niigata students
   * length sensing matrix is OK
Line 13: Line 20:
   * cost estimate arrived
Line 16: Line 24:
Line 18: Line 25:
  * we actually had only two months for room temperature PRMI with dummy payload
   * PR mirrors will be ready by the end of 2017.7 (BS ready by the end of 2017.3)
  * what should we do?
   * initial alignment to both ends before cryopayload is ready (2017.8-9)
   * PR-ETMX cavity during two months of ETMY cryopayload installation?
    * can we do ASC with such a low finesse?
    * PAB said we should do ETMY installation first (since Xend is dangerous)
   * PRM-PR2-PR3 cavity? -> unstable
  * possibility of installing cryopayload earlier is being discussed [Ando, Saito, CRYp]
Line 21: Line 36:
  * Quad IQ Demodulator heat-up issue
  * remake IQ Demodulator LSC to ASC for IMC WFS
  * assemble RF Distribution Amplifier
  * RF Patch Panel modification
  * Quad IQ Demodulator heat-up issue [AEL]
  * remake IQ Demodulator LSC to ASC temporarily for IMC WFS by 2016.10
   * confirmed with Miyakawa that AEL will take care
  * assemble RF Distribution Amplifier [Michimura->Niigata students?]
   * MIF will take care of assembling and purchasing with AEL budget
   * in the process of ordering RF amp (Wenzel LNBA-10-23-CK or LNBA-11-23-CK)
   * in the process of ordering RF splitter (Mini-Circuits ZCSC-8-1+)
   * basically copy of [[https://dcc.ligo.org/LIGO-D1000124/public|LIGO-D1000124]], but we might omit [[https://dcc.ligo.org/LIGO-D1000064/public|Interface]]
  * RF Patch Panel modification [Michimura->Niigata students?]
 * RF generation scheme [Michimura]
  * f1 = 3/8*f2, f3 = 10/8*f2
  * we need 2*f1, 2*f2, f3-f1, f3-f2 as well
  * use harmonics generator (x2, x3, x6, x8, x10, x16 for f2/8 = 5.62698725 MHz)?
  * use multiple signal generators with frequency doubler and differential frequency generator?
 * Summary of OFI telecon on June 24 [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5313|JGW-G1605313]] [Somiya]
  * reduce number of output steering mirrors (OSM) from two to one
  * move OFI postion to be between OMMT2 and OSM
  * suspend OMC and IFI both by single pendula
Line 27: Line 56:
Line 29: Line 57:
  * POY beam is clipped by PR3 optical bench suspension wire   * POY beam is clipped by PR3 optical bench suspension wire [[https://www.dropbox.com/s/4jio2tlmlavoffr/bKAGRA_wframes160621.dxf?dl=0|CAD drawing by Shoda]]
Line 36: Line 64:
  * if watchdog resistance noise should be less than DAC noise, dR < 6e-8 Ohm/rtHz (High Power Coil Driver case), dR < 5e-6 Ohm/rtHz (Low Power Coil Driver case), both at 10 Hz
  * too meet actuator noise requirement, dR < 8e-5 Ohm/rtHz (for BS/SRs), dR < 6e-5 Ohm/rtHz (for PRs), both at 10 Hz
  * watchdog resistance fluctuation was measured to be dR < ~1e-6 Ohm (measurement noise limited) ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5270|JGW-E1605270]])
  * see, also, [[KAGRA/Subgroups/VIS/VISMinutes20160603|VISMinutes20160603]]
Line 37: Line 69:
 * BS baffle could make contract defect? ([[https://dcc.ligo.org/LIGO-T1000090|LIGO-T1000090]]) [Akutsu,Hiro]
Line 48: Line 81:
2016/6/27 14:00 - 15:00 2016/7/11 14:00 - 15:00 (Michimura might be travelling)

ISC Meeting on 2016/6/27 14:00 - 15:00

eZuce: http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2DDsDe9s9eDs9t

Participants: Y. Aso, T. Akutsu, H. Yamamoto, K. Kokeyama, O. Miyakawa, Y. Michimura

Minutes

  • bKAGRA Phase 1 analog electronics
    • Quad IQ Demodulator heat-up issue
      • a
      • decide if we need 1st stage amp or not []

Adgenda

  • bKAGRA Phase 1 optical configuration study [Michimura]
    • HOM structure / LSC / ASC check [Michimura]
      • initiated Optickle 2 modeling: KAGRAOptickle SVN (login required)

      • Optickle (Optickle2) seminar on July 1 densuke

        • announced to Toyama and Niigata students
      • length sensing matrix is OK
    • continue checking dummy ETM availability [Hirose]
      • cost estimate arrived
    • check if reference spheres for PR mirrors are available at Caltech [Hirose]
    • check if IMC length stability and others are compatible with 3-km PRMI [Michimura]
    • check if dummy payload is quiet enough to make PRMI [Michimura]
  • bKAGRA Phase 1 initial alignment / commissioning plan [Michimura]: JGW-T1605274

    • we actually had only two months for room temperature PRMI with dummy payload
      • PR mirrors will be ready by the end of 2017.7 (BS ready by the end of 2017.3)
    • what should we do?
      • initial alignment to both ends before cryopayload is ready (2017.8-9)
      • PR-ETMX cavity during two months of ETMY cryopayload installation?
        • can we do ASC with such a low finesse?
        • PAB said we should do ETMY installation first (since Xend is dangerous)
      • PRM-PR2-PR3 cavity? -> unstable

    • possibility of installing cryopayload earlier is being discussed [Ando, Saito, CRYp]
  • bKAGRA Phase 1 analog electronics request for AEL (Analog Electronics for ISC) [Michimura]

    • request for AEL [Michimura]
    • Quad IQ Demodulator heat-up issue [AEL]
    • remake IQ Demodulator LSC to ASC temporarily for IMC WFS by 2016.10
      • confirmed with Miyakawa that AEL will take care
    • assemble RF Distribution Amplifier [Michimura->Niigata students?]

      • MIF will take care of assembling and purchasing with AEL budget
      • in the process of ordering RF amp (Wenzel LNBA-10-23-CK or LNBA-11-23-CK)
      • in the process of ordering RF splitter (Mini-Circuits ZCSC-8-1+)
      • basically copy of LIGO-D1000124, but we might omit Interface

    • RF Patch Panel modification [Michimura->Niigata students?]

  • RF generation scheme [Michimura]
    • f1 = 3/8*f2, f3 = 10/8*f2
    • we need 2*f1, 2*f2, f3-f1, f3-f2 as well
    • use harmonics generator (x2, x3, x6, x8, x10, x16 for f2/8 = 5.62698725 MHz)?
    • use multiple signal generators with frequency doubler and differential frequency generator?
  • Summary of OFI telecon on June 24 JGW-G1605313 [Somiya]

    • reduce number of output steering mirrors (OSM) from two to one
    • move OFI postion to be between OMMT2 and OSM
    • suspend OMC and IFI both by single pendula


  • bKAGRA optical layout around PRC [Aso]
  • iKAGRA post-run calibration mystery [Aso]
  • Requirement for the noise of watchdogs for coil drivers [Aso]
    • if watchdog resistance noise should be less than DAC noise, dR < 6e-8 Ohm/rtHz (High Power Coil Driver case), dR < 5e-6 Ohm/rtHz (Low Power Coil Driver case), both at 10 Hz

    • too meet actuator noise requirement, dR < 8e-5 Ohm/rtHz (for BS/SRs), dR < 6e-5 Ohm/rtHz (for PRs), both at 10 Hz

    • watchdog resistance fluctuation was measured to be dR < ~1e-6 Ohm (measurement noise limited) (JGW-E1605270)

    • see, also, VISMinutes20160603

  • Viewport quality for GV between SRM and OMMT [Akutsu]
  • BS baffle could make contract defect? (LIGO-T1000090) [Akutsu,Hiro]

  • bKAGRA ISC cabling [Michimura/Doi]
    • Doi-san said he will help.
  • Mirror absorption measurement status [Hirose]
  • Output optics status [Somiya]
    • suspensions for OMMT1/2 is same as IMMT1/2, ask Takahashi-san to add drivers to his list: JGW-L1605193

    • we have to make vacuum compatible PD/QPD for OMC by 2018.3
    • beam shutter: prototype done, AR coating and driver circuit design not yet
  • Magnetic noise, actuator noise calculation for cryogenic payload [Michimura]
  • Task list update (TaskList) [Michimura]

Next meeting

2016/7/11 14:00 - 15:00 (Michimura might be travelling)

back to Meetings page