eZuce: | Participants: Y. Aso, T. Akutsu, H. Yamamoto, K. Kokeyama, O. Miyakawa, Y. Michimura |
Line 5: | Line 6: |
Participants: | == Minutes == * bKAGRA Phase 1 analog electronics * Quad IQ Demodulator heat-up issue * 1st stage amp is heating up * '''decide if we need 1st stage amp or not [Michimura]''' * remake of Quad IQ Demodulator LSC to ASC * MIF will take care istead of AEL * mass production will be taken care by AEL * RF Distribution Amplifier * we will omit RF monitor for now, and add them later * '''ask LIGO people for necessity of RF monitor [Michimura]''' * RF generation scheme * be careful of harmonics generator generating unwanted harmonics * OFI telecon summary * calculation by Somiya show single pendulum is enough for OFI and OMC * but we need cross check -> Somiya, Hiro * bKAGRA optical layout around PRC * POY clipping issue will be solved by modifying PR3 optical bench suspension [Shoda] * we need layout CAD for POY pickoff mirror, POP pickoff mirror to design baffles * '''talk with Kawamura who to assign [Michimura]''' * '''possibility of buying baffles next FY? -> ask SEO [Aso]''' * iKAGRA post-run calibration mystery [Aso] * mysterious LPF was from saturation * '''write an elog about this conclusion [Aso]''' * Viewport quality for GV between SRM and OMMT [Akutsu] * aLIGO case: SRM-OFI-viewport, KAGRA case: SRM-viewport-OMMT-OFI * aLIGO viewport is always closed * if we need super quality viewport, we have to decide soon * Requirement for the noise of watchdogs for coil drivers [Aso] * recent result show dR < 1e-7 Ohm/rtHz, so it may meet the requirement * slow (~20 min) drift at dR ~ 5e-4 Ohm -> this should be negligible |
Line 7: | Line 38: |
== Adgenda == | == Agenda == |
Line 10: | Line 41: |
* initiated Optickle 2 modeling: [[https://granite.phys.s.u-tokyo.ac.jp/trac/LCGT/browser/trunk/mif/KAGRAOptickle/bKAGRAPhase1/|KAGRAOptickle SVN]] (login required) * Optickle (Optickle2) seminar on July 1 [[http://densuke.biz/list?cd=bNJ9WSPSEQNxheCy|densuke]] * LSC sensing matrix is OK |
* initiated Optickle 2 modeling: [[https://granite.phys.s.u-tokyo.ac.jp/trac/LCGT/browser/trunk/mif/KAGRAOptickle/bKAGRAPhase1/|KAGRAOptickle SVN]] (login required) * Optickle (Optickle2) seminar on July 1 [[http://densuke.biz/list?cd=bNJ9WSPSEQNxheCy|densuke]] * announced to Toyama and Niigata students * length sensing matrix is OK |
Line 14: | Line 46: |
* cost estimate arrived | |
Line 17: | Line 50: |
Line 19: | Line 51: |
* we actually had only two months for room temperature PRMI with dummy payload * PR mirrors will be ready by the end of 2017.7 (BS ready by the end of 2017.3) * what should we do? * initial alignment to both ends before cryopayload is ready (2017.8-9) * PR-ETMX cavity during two months of ETMY cryopayload installation? * can we do ASC with such a low finesse? * PAB said we should do ETMY installation first (since Xend is dangerous) * PRM-PR2-PR3 cavity? -> unstable * possibility of installing cryopayload earlier is being discussed [Ando, Saito, CRYp] |
|
Line 22: | Line 62: |
* Quad IQ Demodulator heat-up issue * remake IQ Demodulator LSC to ASC for IMC WFS * assemble RF Distribution Amplifier * RF Patch Panel modification |
* Quad IQ Demodulator heat-up issue [AEL] * remake IQ Demodulator LSC to ASC temporarily for IMC WFS by 2016.10 * confirmed with Miyakawa that AEL will take care * assemble RF Distribution Amplifier [Michimura->Niigata students?] * MIF will take care of assembling and purchasing with AEL budget * in the process of ordering RF amp (Wenzel LNBA-10-23-CK or LNBA-11-23-CK) * in the process of ordering RF splitter (Mini-Circuits ZCSC-8-1+) * basically copy of [[https://dcc.ligo.org/LIGO-D1000124/public|LIGO-D1000124]], but we might omit [[https://dcc.ligo.org/LIGO-D1000064/public|Interface]] * RF Patch Panel modification [Michimura->Niigata students?] * RF generation scheme [Michimura] * f1 = 3/8*f2, f3 = 10/8*f2 * we need 2*f1, 2*f2, f3-f1, f3-f2 as well * use harmonics generator (x2, x3, x6, x8, x10, x16 for f2/8 = 5.62698725 MHz)? * use multiple signal generators with frequency doubler and differential frequency generator? * Summary of OFI telecon on June 24 [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5313|JGW-G1605313]] [Somiya] * reduce number of output steering mirrors (OSM) from two to one * move OFI postion to be between OMMT2 and OSM * suspend OMC and IFI both by single pendula |
Line 28: | Line 82: |
Line 30: | Line 83: |
* POY beam is clipped by PR3 optical bench suspension wire | * POY beam is clipped by PR3 optical bench suspension wire [[https://www.dropbox.com/s/4jio2tlmlavoffr/bKAGRA_wframes160621.dxf?dl=0|CAD drawing by Shoda]] |
Line 37: | Line 90: |
* if watchdog resistance noise should be less than DAC noise, dR < 6e-8 Ohm/rtHz (High Power Coil Driver case), dR < 5e-6 Ohm/rtHz (Low Power Coil Driver case), both at 10 Hz * too meet actuator noise requirement, dR < 8e-5 Ohm/rtHz (for BS/SRs), dR < 6e-5 Ohm/rtHz (for PRs), both at 10 Hz * watchdog resistance fluctuation was measured to be dR < ~1e-6 Ohm (measurement noise limited) ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5270|JGW-E1605270]]) * see, also, [[KAGRA/Subgroups/VIS/VISMinutes20160603|VISMinutes20160603]] |
|
Line 38: | Line 95: |
* BS baffle could make contract defect? ([[https://dcc.ligo.org/LIGO-T1000090|LIGO-T1000090]]) [Akutsu,Hiro] | |
Line 49: | Line 107: |
2016/6/27 14:00 - 15:00 | 2016/7/25 14:00 - 15:00 |
ISC Meeting on 2016/6/27 14:00 - 15:00
eZuce: http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2DDsDe9s9eDs9t
Participants: Y. Aso, T. Akutsu, H. Yamamoto, K. Kokeyama, O. Miyakawa, Y. Michimura
Minutes
- bKAGRA Phase 1 analog electronics
- Quad IQ Demodulator heat-up issue
- 1st stage amp is heating up
decide if we need 1st stage amp or not [Michimura]
- remake of Quad IQ Demodulator LSC to ASC
- MIF will take care istead of AEL
- mass production will be taken care by AEL
- RF Distribution Amplifier
- we will omit RF monitor for now, and add them later
ask LIGO people for necessity of RF monitor [Michimura]
- Quad IQ Demodulator heat-up issue
- RF generation scheme
- be careful of harmonics generator generating unwanted harmonics
- OFI telecon summary
- calculation by Somiya show single pendulum is enough for OFI and OMC
but we need cross check -> Somiya, Hiro
- bKAGRA optical layout around PRC
- POY clipping issue will be solved by modifying PR3 optical bench suspension [Shoda]
- we need layout CAD for POY pickoff mirror, POP pickoff mirror to design baffles
talk with Kawamura who to assign [Michimura]
possibility of buying baffles next FY? -> ask SEO [Aso]
- iKAGRA post-run calibration mystery [Aso]
- mysterious LPF was from saturation
write an elog about this conclusion [Aso]
- Viewport quality for GV between SRM and OMMT [Akutsu]
- aLIGO case: SRM-OFI-viewport, KAGRA case: SRM-viewport-OMMT-OFI
- aLIGO viewport is always closed
- if we need super quality viewport, we have to decide soon
- Requirement for the noise of watchdogs for coil drivers [Aso]
recent result show dR < 1e-7 Ohm/rtHz, so it may meet the requirement
slow (~20 min) drift at dR ~ 5e-4 Ohm -> this should be negligible
Agenda
- bKAGRA Phase 1 optical configuration study [Michimura]
- HOM structure / LSC / ASC check [Michimura]
initiated Optickle 2 modeling: KAGRAOptickle SVN (login required)
Optickle (Optickle2) seminar on July 1 densuke
- announced to Toyama and Niigata students
- length sensing matrix is OK
- continue checking dummy ETM availability [Hirose]
- cost estimate arrived
- check if reference spheres for PR mirrors are available at Caltech [Hirose]
- check if IMC length stability and others are compatible with 3-km PRMI [Michimura]
- check if dummy payload is quiet enough to make PRMI [Michimura]
- HOM structure / LSC / ASC check [Michimura]
bKAGRA Phase 1 initial alignment / commissioning plan [Michimura]: JGW-T1605274
- we actually had only two months for room temperature PRMI with dummy payload
- PR mirrors will be ready by the end of 2017.7 (BS ready by the end of 2017.3)
- what should we do?
- initial alignment to both ends before cryopayload is ready (2017.8-9)
- PR-ETMX cavity during two months of ETMY cryopayload installation?
- can we do ASC with such a low finesse?
- PAB said we should do ETMY installation first (since Xend is dangerous)
PRM-PR2-PR3 cavity? -> unstable
- possibility of installing cryopayload earlier is being discussed [Ando, Saito, CRYp]
- we actually had only two months for room temperature PRMI with dummy payload
bKAGRA Phase 1 analog electronics request for AEL (Analog Electronics for ISC) [Michimura]
- request for AEL [Michimura]
- Quad IQ Demodulator heat-up issue [AEL]
- remake IQ Demodulator LSC to ASC temporarily for IMC WFS by 2016.10
- confirmed with Miyakawa that AEL will take care
assemble RF Distribution Amplifier [Michimura->Niigata students?]
- MIF will take care of assembling and purchasing with AEL budget
- in the process of ordering RF amp (Wenzel LNBA-10-23-CK or LNBA-11-23-CK)
- in the process of ordering RF splitter (Mini-Circuits ZCSC-8-1+)
basically copy of LIGO-D1000124, but we might omit Interface
RF Patch Panel modification [Michimura->Niigata students?]
- RF generation scheme [Michimura]
- f1 = 3/8*f2, f3 = 10/8*f2
- we need 2*f1, 2*f2, f3-f1, f3-f2 as well
- use harmonics generator (x2, x3, x6, x8, x10, x16 for f2/8 = 5.62698725 MHz)?
- use multiple signal generators with frequency doubler and differential frequency generator?
Summary of OFI telecon on June 24 JGW-G1605313 [Somiya]
- reduce number of output steering mirrors (OSM) from two to one
- move OFI postion to be between OMMT2 and OSM
- suspend OMC and IFI both by single pendula
- bKAGRA optical layout around PRC [Aso]
POY beam is clipped by PR3 optical bench suspension wire CAD drawing by Shoda
JGW-T1605261 (cartoon)
- iKAGRA post-run calibration mystery [Aso]
- mysterious LPF was probably from saturation (is this end of the story?)
Miyo-kun did time delay fitting: Jupyter Notebook, Files in Dropbox
- Requirement for the noise of watchdogs for coil drivers [Aso]
if watchdog resistance noise should be less than DAC noise, dR < 6e-8 Ohm/rtHz (High Power Coil Driver case), dR < 5e-6 Ohm/rtHz (Low Power Coil Driver case), both at 10 Hz
too meet actuator noise requirement, dR < 8e-5 Ohm/rtHz (for BS/SRs), dR < 6e-5 Ohm/rtHz (for PRs), both at 10 Hz
watchdog resistance fluctuation was measured to be dR < ~1e-6 Ohm (measurement noise limited) (JGW-E1605270)
see, also, VISMinutes20160603
- Viewport quality for GV between SRM and OMMT [Akutsu]
BS baffle could make contract defect? (LIGO-T1000090) [Akutsu,Hiro]
- bKAGRA ISC cabling [Michimura/Doi]
- Doi-san said he will help.
- Mirror absorption measurement status [Hirose]
- Output optics status [Somiya]
suspensions for OMMT1/2 is same as IMMT1/2, ask Takahashi-san to add drivers to his list: JGW-L1605193
- we have to make vacuum compatible PD/QPD for OMC by 2018.3
- beam shutter: prototype done, AR coating and driver circuit design not yet
- Magnetic noise, actuator noise calculation for cryogenic payload [Michimura]
Task list update (TaskList) [Michimura]
Next meeting
2016/7/25 14:00 - 15:00