ISC Meeting on 2021/06/28 14:00 - 15:00
Participants: Keiko Kokeyama, Chiaki Hirose, Kiwamu Izumi, Masayuki Nakano, Ryosuke Sugimoto, Satoshi Tanioka, Yoichi Aso, Tomotada Akutsu, Kenta Tanaka, Shoichi Oshino, Hiroaki Yamamoto, Shinji Miyoki, Osamu Miyakawa, Yuta Michimura
Zoom meeting: https://zoom.us/j/6676627462
Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20210628T0500
Next meeting
TBD
Minutes
- Phase camera project [Kokeyama]
- How to get the reference beam?
- IR fiber is already there at POP/POS (main + spare for green, two for IR; 4 fibers in total for each table)
- Speed of phase camera?
- Important if we use the signal for some alignment control etc.
- At Virgo, it was ~ 1 shot / 1 sec. Daniel Brown et al at Adelaide are making faster ones.
- Discuss more after result comes out (October-ish)
- Optical table layout and electronics needs to be checked
- Maybe we need such device anyway at some point
DECISION KAGRA ISC supports the proposal
- How to get the reference beam?
- ALS report [Izumi]
- Arm locking section of the users manual is not finished.
A/I: Talk with Nakano etc. to complete the manual [Izumi]
- Noise level of PLL control/error signals are somehow breathing
A/I: Remind Tanioka about the procurement of items related to alignment [Michimura]
- Arm locking section of the users manual is not finished.
- IMC ASC report [Kenta, C. Hirose]
- Control strategy needs to be re-checked.
- Analytical calculation and FINESSE simulation result do not match completely.
A/I: Check the calbiration of A2L coupling factor and the status of coil balancing.
- IMMT1T ISS POM [Michimura]
- There is another uncertainty on the loss introduced at the viewports (AR specified only at 0 deg incidence).
DECISION We will go for 90:10.
Agenda
IMC ASC [Kenta, C. Hirose, 20 min] https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13047 ISCmeeting_0628_hirose.pdf
Phase camera project [Kokeyama, 10 min] slide
- ALS report [Izumi, 10 min]
ALS users manual https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13031
Remaining tasks for ALS https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13042
- IMMT1T ISS POM spec (see below) [Michimura, 10 min]
O4 commissioning task list [Izumi, Michimura]
- Any missing items?
- Other reports
Non-polarizing beam splitters for in-air optical tables ordered https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12956 [Michimura]
In-vac steering mirrors: https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12592 [Michimura]
- IMMT1T ISS POM: Spec to be finalized
R:T=90:10 for 1064 nm, transmissive for oplev beam (663-675nm) https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12949
- 0.2963% @ 1064 nm measured by the vendor. 0.22% measured by Akutsu-san at the site.
- Need to check again if ISS people is happy about R=90%
- Wedge finalized to be 1 deg (wedge side is HR)
- All reflective steering mirrors: Spec to be finalized
- Order AoI=0-30 deg ones and AoI=30-50 ones
- Wedge finalized to be 0.5 deg
- IMMT1T ISS POM: Spec to be finalized
- Optical table cover [Michimura]
- IMC TRANS assembled, IMC REFL delivered
- Parts for fixing FFU on REFL, POP, AS ordered
- TRX and TRY ordered
- Additional small FFU for POS ordered