Line 14: Line 14:
 * Phase camera project [Kokeyama]
  * How to get the reference beam?
   * IR fiber is already there at POP/POS (main + spare for green, two for IR; 4 fibers in total for each table)
  * Speed of phase camera?
   * Important if we use the signal for some alignment control etc.
   * At Virgo, it was ~ 1 shot / 1 sec. Daniel Brown et al at Adelaide are making faster ones.
  * Discuss more after result comes out (October-ish)
  * Optical table layout and electronics needs to be checked
   * Maybe we need such device anyway at some point
  * '''DECISION''' KAGRA ISC supports the proposal
 * ALS report [Izumi]
  * Arm locking section of the users manual is not finished.
   * '''A/I''': Talk with Nakano etc. to complete the manual [Izumi]
  * Noise level of PLL control/error signals are somehow breathing
  * '''A/I''': Remind Tanioka about the procurement of items related to alignment [Michimura]
 * IMC ASC report [Kenta, C. Hirose]
  * Control strategy needs to be re-checked.
  * Analytical calculation and FINESSE simulation result do not match completely.
  * '''A/I''': Check the calbiration of A2L coupling factor and the status of coil balancing.
 * IMMT1T ISS POM [Michimura]
  * There is another uncertainty on the loss introduced at the viewports (AR specified only at 0 deg incidence).
  * '''DECISION''' We will go for 90:10.

ISC Meeting on 2020/06/28 14:00 - 15:00

Participants: Keiko Kokeyama, Chiaki Hirose, Kiwamu Izumi, Masayuki Nakano, Ryosuke Sugimoto, Satoshi Tanioka, Yoichi Aso, Tomotada Akutsu, Kenta Tanaka, Shoichi Oshino, Hiroaki Yamamoto, Shinji Miyoki, Osamu Miyakawa, Yuta Michimura

Zoom meeting: https://zoom.us/j/6676627462

Your time zone: https://www.timeanddate.com/worldclock/fixedtime.html?iso=20210628T0500

Next meeting

TBD

back to Meetings page

Minutes

  • Phase camera project [Kokeyama]
    • How to get the reference beam?
      • IR fiber is already there at POP/POS (main + spare for green, two for IR; 4 fibers in total for each table)
    • Speed of phase camera?
      • Important if we use the signal for some alignment control etc.
      • At Virgo, it was ~ 1 shot / 1 sec. Daniel Brown et al at Adelaide are making faster ones.
    • Discuss more after result comes out (October-ish)
    • Optical table layout and electronics needs to be checked
      • Maybe we need such device anyway at some point
    • DECISION KAGRA ISC supports the proposal

  • ALS report [Izumi]
    • Arm locking section of the users manual is not finished.
      • A/I: Talk with Nakano etc. to complete the manual [Izumi]

    • Noise level of PLL control/error signals are somehow breathing
    • A/I: Remind Tanioka about the procurement of items related to alignment [Michimura]

  • IMC ASC report [Kenta, C. Hirose]
    • Control strategy needs to be re-checked.
    • Analytical calculation and FINESSE simulation result do not match completely.
    • A/I: Check the calbiration of A2L coupling factor and the status of coil balancing.

  • IMMT1T ISS POM [Michimura]
    • There is another uncertainty on the loss introduced at the viewports (AR specified only at 0 deg incidence).
    • DECISION We will go for 90:10.