=== Management [Aso, Michimura] === 
=== Management [Aso, Michimura] ===
Line 22: Line 20:
 
Line 31: Line 29:
 -> '''To be confirmed'''   . -> '''To be confirmed'''
Line 35: Line 33:
   -> Eventhough the procedure may be changed at the site, it is important to have an official procedure and update it as we develop a better method.
 * Actually perform the initial alignment [Michimura + Students] O 
  -> Need coordination with VIS people (we need them at the site during the alignment work)
  . -> Eventhough the procedure may be changed at the site, it is important to have an official procedure and update it as we develop a better method.
 * Actually perform the initial alignment [Michimura + Students] O
  . -> Need coordination with VIS people (we need them at the site during the alignment work)
Line 50: Line 48:
* Management [Aso, Michimura] O
Line 51: Line 50:
* Management [Aso, Michimura] O
Line 57: Line 55:
Line 58: Line 57:
  * Decide whether IBF is necessary or not [Aso, Hirose, Somiya, Michimura] O 
    -> It is related to OMC and also the control of the auxiliary DOFs. '''Aso will propose how to organize the work.'''
  * Decide whether IBF is necessary or not [Aso, Hirose, Somiya, Michimura] O
   . -> It is related to OMC and also the control of the auxiliary DOFs. '''Aso will propose how to organize the work.'''
Line 62: Line 61:
     
Line 65: Line 63:
Line 69: Line 68:
Line 78: Line 78:
 * REFL table optical design [Students + Kawamura] 
* REFL table optical design [Students + Kawamura]
Line 85: Line 86:
Line 91: Line 93:
Line 94: Line 97:
Line 95: Line 99:
 * Design of the ALS -> '''To be discussed with Kawamura-san''
   * Review the noise budget for the ALS [Students + Aso, Kawamura]
   * Make design drawings of the ALS [Students + Aso, Kawamura]
 * Deceide a scheme to generate f3 & f1 (AM) sidebands [Nakano, Michimura, Uehara, Somiya]
   -> This is probably within the scope of Nakano-kun's PhD project. '''To be confirmed with Kawamura-san''
 * Design of the ALS -> '''To be discussed with Kawamura-san'' '''''
  * '''''Review the noise budget for the ALS [Students + Aso, Kawamura] '''''
  * '''''Make design drawings of the ALS [Students + Aso, Kawamura] '''''
 * '''''Deceide a scheme to generate f3 & f1 (AM) sidebands [Nakano, Michimura, Uehara, Somiya]  '''''
  . '''''-> This is probably within the scope of Nakano-kun's PhD project. '''''''To be confirmed with Kawamura-san''
Line 103: Line 107:
Line 108: Line 113:
Line 112: Line 118:
Line 118: Line 125:

ISC Task Assignment Plan 2015/8/10

A task with O mark means the assignment was confirmed

iKAGRA

Management [Aso, Michimura]

  • Finalize the task list
  • Assign people to the tasks
  • Make a schedule for iKAGRA ISC tasks -> Important: to be done first

Analog Electronics (MIF, IOO, AEL)

  • Complete the iKAGRA ISC electronics diagram [Michimura] O
  • Make a cabling plan [Michimura] O
  • Installation of the ISC electronics for iKAGRA [Aso, Nakano] O

Integration with the Digital Control System (MIF, IOO, DGS)

  • Make a channel list for iKAGRA ISC (including whether each channel needs a whitening filter) [Kokeyama] O
  • Write ISC real time codes [Student + Kokeyama, Michimura] O
  • Create MEDM screens [Student + Kokeyama, Michimura] O
  • Write guardian scripts [Student + Kokeyama, Michimura] O

Cameras (AOS)

  • Decide where to put cameras [Aso, Kokeyama] O
  • Figure out how to mount the cameras [Aso, Kokeyama] O
  • Test the camera server [Kokeyama, Aso] O
  • Buy more cameras [Aso] O
  • Install the cameras [Kokeyama, Aso + Students] O

Optical Layout of the REFL bench (IOO) [Toyama Univ.]

  • -> To be confirmed

Initial Alignment (MIF)

  • Write a document of the initial alignment procedure for iKAGRA [Michimura] △
    • -> Eventhough the procedure may be changed at the site, it is important to have an official procedure and update it as we develop a better method.

  • Actually perform the initial alignment [Michimura + Students] O
    • -> Need coordination with VIS people (we need them at the site during the alignment work)

Commissioning of the Mode Cleaner (IOO)

  • List up measurements to be done with iKAGRA [Kawamura + everyone] -> To be confirmed

Commissioning of the Michelson

  • List up measurements to be done with iKAGRA [Aso + everyone] O

ISC Modeling (MIF, IOO)

  • Build a model of iKAGRA with Chris's noise budget code [Student + Michimura] O
  • Make a noise budget for iKAGRA -> feed this information to the commissioning task list [Student + Michimura] O

bKAGRA

* Management [Aso, Michimura] O

  • Finalize the task list
    • Assign people to the tasks
  • Make a schedule for bKAGRA ISC tasks

* Interferometer optical simulations (MIF)

  • FFT simulations with realistic mirror maps [Hirose, Hiro Yamamoto] O
    • Decide whether IBF is necessary or not [Aso, Hirose, Somiya, Michimura] O
      • -> It is related to OMC and also the control of the auxiliary DOFs. Aso will propose how to organize the work.

    • Requirements on the PRG, intra-cavity power, contrast defects [JANGO] O -> Need to specify the task more in detail

    • Thermal lensing of the MIF mirrors [JANGO] O -> Need to specify the task more in detail

* ISC Modeling (MIF, IOO)

  • Build a model of bKAGRA with Chris's noise budget code [Students + Michimura] O
    • Fix the laser frequency stabilization servo design [Michimura, Aso] O

* AS Port Design (IOO)

  • Overall design of the AS optics (after SRM) [Somiya + Students] O
    • OFI design [Somiya + Students] - > Pending

    • OMMT design [Somiya + Students] O
    • Steering mirrors ? [Somiya + Students]
    • OMC design [Somiya + Students] O
      • Setting OMC requirements or ITM polish requirements using simulations with real mirror maps [Somiya, Hiro Yamamoto] -> To be merged with the simulation tasks above.

      • Discuss with overseas groups about vibration isolation systems for OMC (and possibly other AS optics) [Somiya, Akutsu]

* Other Signal Ports (IOO) -> To be confirmed

  • REFL table optical design [Students + Kawamura]
  • POP table optical design [Students + Kawamura]
  • POS table optical design [Students + Kawamura]
  • POX/POY table optical design [Students + Kawamura]
  • In-vac PD design [Doi, Aso]

* Laser Power Management (IOO, MIF, CRY)

  • How to change the laser power during the operation [Students + Kawamura] -> To be confirmed

  • Check the compatibility of the variable laser power with cryogenics [K. Yamamoto] -> To be confirmed

  • Beam shutters (in-air, in-vac) [Somiya + Students] O
  • High power beam damps [Akutsu] -> To be confirmed

* Initial Alignment (MIF)

  • Write a document of the initial alignment procedure for bKAGRA [Michimura] O

* Lock Acquisition (MIF, IOO)

  • Simulation of the signals with various interferometer configurations (DRMI, PRFPMI, etc) using Optickle and Finesse (cross check) [Students + Michimura, Aso] O
  • Design of the ALS -> To be discussed with Kawamura-san

    • Review the noise budget for the ALS [Students + Aso, Kawamura]

    • Make design drawings of the ALS [Students + Aso, Kawamura]

  • Deceide a scheme to generate f3 & f1 (AM) sidebands [Nakano, Michimura, Uehara, Somiya]

    • -> This is probably within the scope of Nakano-kun's PhD project. 'To be confirmed with Kawamura-san

  • Write a document for the lock acquisition procednure [Students + Aso] O

* Analog Electronics (MIF, IOO, AEL)

  • List up necessary ISC electronics for bKAGRA [Michimura, Aso] O
  • Draw an ISC electronics diagram for bKAGRA [Michimura] O
  • Make a cabling plan [Michimura] O

* Integration with the Digital Control System (MIF, IOO, DGS)

  • Write ISC real time codes [Student + Kokeyama, Michimura] O
  • Create MEDM screens [Student + Kokeyama, Michimura] O

* Cameras (AOS)

  • Decide where to put cameras [Aso, Kokeyama] O
  • Figure out how to mount the cameras [Aso, Kokeyama] O
  • Buy more cameras [Aso] O
  • Consider how to look at the cryogenic mirror surfaces (MIF, CRY) [Tomaru ?, Aso] -> To be discussed with Tomaru-san

* Commissioning (MIF)

  • Make a commissioning plan for bKAGRA [Aso + everyone] O

KAGRA/subgroup/ifo/MIF/TasksAssignment20150810 (last edited 2015-08-11 06:45:11 by YoichiAso)