ISC Task Assignment Plan 2015/8/10

A task with O mark means the assignment was confirmed

iKAGRA

Management [Aso, Michimura]

Analog Electronics (MIF, IOO, AEL)

Integration with the Digital Control System (MIF, IOO, DGS)

Cameras (AOS)

Optical Layout of the REFL bench (IOO) [Toyama Univ.]

Initial Alignment (MIF)

Commissioning of the Mode Cleaner (IOO)

Commissioning of the Michelson

ISC Modeling (MIF, IOO)

bKAGRA

* Management [Aso, Michimura] O

* Interferometer optical simulations (MIF)

* ISC Modeling (MIF, IOO)

* AS Port Design (IOO)

* Other Signal Ports (IOO) -> To be confirmed

* Laser Power Management (IOO, MIF, CRY)

* Initial Alignment (MIF)

* Lock Acquisition (MIF, IOO)

* Analog Electronics (MIF, IOO, AEL)

* Integration with the Digital Control System (MIF, IOO, DGS)

* Cameras (AOS)

* Commissioning (MIF)