Size: 4337
Comment:
|
Size: 4336
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]]<<BR>> [[LCGT/Terminology|Terminology]]|| ||Tools||How to use this [[newusers|JGW Wiki]]<<BR>> KAGRA [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|conference calendar]]<<BR>> How to use [[LCGT/Meeting/EVOen|EVO]]<<BR>> How to upload documents to [[JGWDoc/HowTo/UpLoad|JGWDoc]]<<BR>> How to use [[LCGT/SVN|SVN]]<<BR>> [[LCGT/subgroup/howtojoin|Mailing lists]]|| |
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]]<<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|Blogs]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]]<<BR>> [[LCGT/Terminology|Terminology]]|| ||Tools||KAGRA [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|conference calendar]]<<BR>> How to use [[LCGT/Meeting/EVOen|EVO]]<<BR>> How to upload documents to [[JGWDoc/HowTo/UpLoad|JGWDoc]]<<BR>> How to use [[LCGT/SVN|SVN]]<<BR>> How to join [[LCGT/subgroup/howtojoin|Mailing lists]]<<BR>> How to use this [[newusers|JGW Wiki]]|| |
Line 35: | Line 35: |
* [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem blogs]] |
KAGRA Wiki
News
Links
KAGRA collaboration meeting |
|
Subsystem |
||
Special WG |
KAGRA Roadmap |
|
Documents |
|
Tools |
KAGRA conference calendar |
Subsystems
Subgroup name |
Links |
||
Tunnel |
(TUN) |
||
Facility |
(FCL) |
|
|
Vacuum |
(VAC) |
|
|
Cryogenics |
(CRY) |
||
Vibration Isolation |
(VIS) |
||
Mirror |
(MIR) |
|
|
Laser |
(LAS) |
|
|
Main Interferometer |
(MIF) |
|
|
Input/Output Optics |
(IOO) |
|
|
Auxiliary Optics Subsystem |
(AOS) |
||
Analog Electronics |
(AEL) |
|
|
Digital System |
(DGS) |
||
Data Analysis |
(DAS) |
|
|
Geophysics Interferometer |
(GIF) |
|
|
Detector Configuration |
(DET) |
Project time-line
Time-line chart is here (password protected).
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Official Sensitivity of bKAGRA
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)