Size: 3656
Comment:
|
Size: 3653
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[KAGRA/iKAGRA|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]|| | ||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[KAGRA/iKAGRA|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]|| |
Line 35: | Line 35: |
* [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOGs]] |
KAGRA Wiki
News
Links
KAGRA collaboration meeting |
|
Subsystem |
||
Special WG |
KAGRA Roadmap |
|
Documents |
|
Tools |
How to use this JGW Wiki |
Subsystems
Subsystem wiki page |
Tunnel (TUN) |
Facility (FCL) |
Vacuum (VAC) |
Cryogenics (CRY) |
Vibration Isolation (VIS) |
Mirror (MIR) |
Laser (LAS) |
Main Interferometer (MIF) |
Input/Output Optics (IOO) |
Analog Electronics (AEL) |
Digital System (DGS) |
Data Analysis (DAS) |
Detector Configuration (DET) |
Project time-line
Time-line chart is here (password protected).
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Official Sensitivity of bKAGRA
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)