KAGRA Wiki
News
Links
| KAGRA collaboration meeting  | 
 | Subsystem | ||
| Special WG |  KAGRA Roadmap | 
 | Documents | |
| Tools | KAGRA conference calendar | 
Subsystems
| Subgroup name | Links | ||
| Tunnel | (TUN) | ||
| Facility | (FCL) | 
 | |
| Vacuum | (VAC) | 
 | |
| Cryogenics | (CRY) | ||
| Vibration Isolation | (VIS) | ||
| Mirror | (MIR) | 
 | |
| Laser | (LAS) | 
 | |
| Main Interferometer | (MIF) | 
 | |
| Input/Output Optics | (IOO) | 
 | |
| Auxiliary Optics Subsystem | (AOS) | ||
| Analog Electronics | (AEL) | 
 | |
| Digital System | (DGS) | ||
| Data Analysis | (DAS) | 
 | |
| Geophysics Interferometer | (GIF) | 
 | |
| Detector Configuration | (DET) | ||
Project time-line
- Time-line chart is here (password protected). 
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Official Sensitivity of bKAGRA
KAGRA Official Documents
Others
- Misc. (tools, past discussions, etc.) 

