Differences between revisions 1 and 25 (spanning 24 versions)
Revision 1 as of 2010-09-21 09:53:58
Size: 837
Comment:
Revision 25 as of 2010-10-12 15:18:29
Size: 1417
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
1st: September 21, 2010(Tue) 14pm-15pm(JST) = LCGT subgroup leader meeting =

[[LCGT/Meeting/Leader/About|About this meeting]]

== Meeting schedule ==

 .Every 2nd, 4th and 5th(if exists) Monday, 2pm(JST)

----
<<TableOfContents(3)>>
----

== 3rd: October 12, 2010(Tue) 15:00-16:00(JST) ==

Files
 *[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=206|Laser room another plan by Talada (password protected)]]

Files
 *[[attachment:LCGT/Meeting/Leader/20101012/Cryo20101012_cm.ppt|Cryo by Suzuki]]
 *[[attachment:LCGT/Meeting/Leader/20101004/lcgt_geo_101012.pdf|Baseline by Araya]]

Munite
 *[[LCGT/Meeting/Leader/20101012/minute|Minute]]


== 2nd: October 4, 2010(Mon) 14:00-15:00(JST) ==

Files
 *[[attachment:LCGT/Meeting/Leader/20101004/evo20101004Cryo.ppt|Cryo by Suzuki]]

Munite
 *[[LCGT/Meeting/Leader/20101004/minute|Minute]]


== 1st: September 21, 2010(Tue) 14:00-15:00(JST) ==
Line 5: Line 39:
Agenda
Line 7: Line 40:
General report of the project (progress since the last meeting on 2nd, August)
Construction Schedule in detail (based on the summary by PM support group)
Revised organization diagram (renewed sub-WGs, newly created LCGT Steering Committee)
Guideline to accept new members of LCGT
Diameter of vacuum tube (re-confirmation)
Progress report of MOU with LIGO for the cooperative research agreement (discussion point: Policy of data-exchange in future)
Others
Line 15: Line 41:
 *[[attachment:LCGT/Meeting/Leader/20100921/IOP_Laser_Room_100813.pdf|Input Optics (IOP) by Telada]]
 *[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=175|IFO Design by Aso]]
 *[[attachment:LCGT/Meeting/Leader/20100921/20100802_Lmeetign_digital.pdf|Digital system by Miyakawa]]
 *[[attachment:LCGT/Meeting/Leader/20100921/lcgt_geo_100921.pdf|Base line IFO by Araya]]
Line 16: Line 46:
2.Time schedule for LCGT project (password protected)
3.LCGT Construction organization (password protected)
4.Guideline of the membership of LCGT Collaboration (password protected)
5.Determination of the diameter of vacuum tube (password protected)
Munite
 *[[LCGT/Meeting/Leader/20100919/minute|Minute]]

LCGT subgroup leader meeting

About this meeting

Meeting schedule

  • Every 2nd, 4th and 5th(if exists) Monday, 2pm(JST)



3rd: October 12, 2010(Tue) 15:00-16:00(JST)

Files

Files

Munite

2nd: October 4, 2010(Mon) 14:00-15:00(JST)

Files

Munite

1st: September 21, 2010(Tue) 14:00-15:00(JST)

EVO information

Files

Munite

LCGT/Meeting/Leader (last edited 2012-06-06 12:32:42 by OsamuMiyakawa)