Differences between revisions 11 and 18 (spanning 7 versions)
Revision 11 as of 2014-01-16 12:31:08
Size: 1941
Comment:
Revision 18 as of 2014-01-25 12:27:09
Size: 2205
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
'''First day (11:00 open)''' '''First day (11:00 open)'''                                   
Line 5: Line 5:
                                                     - Chair person* not confirmed     - Chair: Kuroda -
Line 7: Line 7:
    - Chair: Kuroda Introduction of New members (30 min)
Line 9: Line 9:
Introduction of New members (30 minutes) Project Status
Line 11: Line 11:
Project Status (30 minutes)    Kajita: ''Status of the KAGRA Project'' (30 min)
Line 13: Line 13:
        ''Lunch Break (12:00-13:30) ''    Saito: ''SEO report'' (15 min)
Line 15: Line 15:
   - Chair: Kanda*         ''Lunch Break (11:45-13:15) ''
Line 17: Line 17:
SEO report (15 minutes)    - Chair: Kanda -
Line 21: Line 21:
- Chair: Saito*    Kanda: ''Policy of CPC'' (5 min)
Line 23: Line 23:
Installation and Commissioning Schedule (155 minutes in total)    Flaminio: ''Co-authorship in other projects'' (5 min)
Line 25: Line 25:
Outline (20 minutes) Subsystem Report-1 (30 min)
Line 27: Line 27:
VAC (25 minutes)    TUN, FCL

  - Chair: Saito -

Installation and Commissioning Schedule (155 minutes)

   Saito: ''Outline'' (20 min)

   Saito: ''VAC'' (25 min)
Line 31: Line 39:
  - Chair: Ando*   - Chair: Ando -
Line 33: Line 41:
MIF + AOS (40 minutes) MIF + AOS (40 min)
Line 35: Line 43:
IOO    (40 minutes)     Kawamura: ''IOO'' (40 min)
Line 37: Line 45:
VIS (30 minutes)     Takahashi: ''VIS'' (30 min)
Line 43: Line 51:
- Chair: Falaminio*    - Chair: Falaminio -
Line 47: Line 55:
Jean-Yves Vinet   (45 minutes)    Jean-Yves Vinet: (45 minutes)
Line 49: Line 57:
Yuri Levin (45 minutes)    Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers''(45 minutes)
Line 53: Line 61:
 - Chair: Miyakawa    - Chair: Miyakawa -
Line 55: Line 63:
Progress report        (160 minutes in total) Progress report 1 (50 min)
Line 61: Line 69:
        ''Lunch Break (12:10-13:30) ''         ''Lunch Break (12:10-13:40) ''
Line 63: Line 71:
- Chair: Uchiyama    - Chair: Uchiyama -

Progress Report 2 (110 min)
Line 69: Line 79:
Geophysics IF: corner-cube reflector (20 min) Geophysics IF
     Akito Araya and Akiteru Takamori: ''Observation system and optics configuration''(20 min)

        ''Coffee Break (14:40-15:00) ''
Line 73: Line 86:
        ''Coffee Break (14:55-15:15) ''
Line 77: Line 88:
- Chair: Akutsu    - Chair: Somiya -
Line 79: Line 90:
Subsystem Report-1 (80 minutes) Advanced R&D (60 min)
Line 81: Line 92:
TUN, FCL, DetChar    TBD
Line 87: Line 98:
- Chair: Hyun-Won Lee    - Chair: Hyun-Won Lee -
Line 89: Line 100:
Subsystem Report-2 (90 minutes) Subsystem Report-2 (90 minutes)    
Line 91: Line 102:
DAS, DMG, DGS/AEL DetChar, DAS, DMG
Line 95: Line 106:
- Chair: Somiya* Subsystem Report-3 (30 min)
Line 97: Line 108:
R&D report (30 minutes) DGS/AEL

Program

First day (11:00 open)

  • - Chair: Kuroda -

Introduction of New members (30 min)

Project Status

  • Kajita: Status of the KAGRA Project (30 min)

    Saito: SEO report (15 min)

    • Lunch Break (11:45-13:15)

    - Chair: Kanda -

Collaboration status + Membership (10 + 20 minutes)

  • Kanda: Policy of CPC (5 min)

    Flaminio: Co-authorship in other projects (5 min)

Subsystem Report-1 (30 min)

  • TUN, FCL
  • - Chair: Saito -

Installation and Commissioning Schedule (155 minutes)

  • Saito: Outline (20 min)

    Saito: VAC (25 min)

    • Coffee Break (15:00-15:20)

  • - Chair: Ando -

MIF + AOS (40 min)

  • Kawamura: IOO (40 min)

    Takahashi: VIS (30 min)

    • Meeting of International Board of Representatives

Second day (9:30-17:00+ Banquet)

  • - Chair: Falaminio -

Invited talks (90 minutes)

  • Jean-Yves Vinet: (45 minutes)

    Yuri Levin: Reciprocity relationships for gravitational-waves interferometers(45 minutes)

    • Coffee Break (11:00-11:20)

    - Chair: Miyakawa -

Progress report 1 (50 min)

Cryo-payload: suspension structure (25 min)

Cryo-payload: vibration reduction (25 min)

  • Lunch Break (12:10-13:40)

  • - Chair: Uchiyama -

Progress Report 2 (110 min)

Cryo-payload: cool-down process of a sapphire mirror (20 min) -

Input optics: Fiber-ring cavity (20 min)

Geophysics IF

  • Akito Araya and Akiteru Takamori: Observation system and optics configuration(20 min)

    • Coffee Break (14:40-15:00)

Mirror: sapphire mirror characteristics (25 min)

Auxiliary optics: BRT design (25 min)

  • - Chair: Somiya -

Advanced R&D (60 min)

  • TBD
    • Banquet

Third day (9:30-12:00)

  • - Chair: Hyun-Won Lee -

Subsystem Report-2 (90 minutes)

DetChar, DAS, DMG

  • Coffee Break (11:00-11:20)

Subsystem Report-3 (30 min)

DGS/AEL

Concluding Remark (10 minutes)

LCGT/Meeting/f2f/2014Feb (last edited 2017-05-10 17:02:46 by YousukeIto)