Differences between revisions 15 and 26 (spanning 11 versions)
Revision 15 as of 2014-01-16 17:04:31
Size: 1956
Comment:
Revision 26 as of 2014-01-25 18:33:53
Size: 2166
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
'''First day (11:00 open)''' '''First day (11:00 open)'''                                   
Line 5: Line 5:
                                                     - Chair person* not confirmed - Chair: Kuroda -
Line 7: Line 7:
    - Chair: Kuroda - Introduction of New members (30 min)
Line 9: Line 9:
Introduction of New members (30 minutes) Project Status
Line 11: Line 11:
Project Status (30 minutes)  Kajita: ''Status of the KAGRA Project'' (30 min)
Line 13: Line 13:
        ''Lunch Break (12:00-13:30) ''  Saito: ''SEO report'' (15 min)
Line 15: Line 15:
   - Chair: Kanda - ''Lunch Break (11:45-13:15) ''
Line 17: Line 17:
SEO report (15 minutes) - Chair: Kanda -
Line 21: Line 21:
Installation and Commissioning Schedule (155 minutes in total)  Kanda: ''Policy of CPC'' (5 min)
Line 23: Line 23:
Outline (20 minutes)  Flaminio: ''Co-authorship in other projects'' (5 min)
Line 25: Line 25:
VAC (25 minutes) Subsystem Report-1 (30 min)
Line 27: Line 27:
        ''Coffee Break (15:00-15:20) ''  TUN, FCL
Line 29: Line 29:
  - Chair: Ando - - Chair: Saito -
Line 31: Line 31:
MIF + AOS (40 minutes) Installation and Commissioning Schedule (155 minutes)
Line 33: Line 33:
IOO (40 minutes) Outline (20 min)
Line 35: Line 35:
VIS (30 minutes)  Kawamura: ''Commissioning of iKAGRA'' (10 min)
Line 37: Line 37:
        '''Meeting of International Board of Representatives'''  Ohashi: ''TBD'' (10 min)

 Saito: ''VAC'' (25 min)

''Coffee Break (15:00-15:20) ''

- Chair: Ando -

MIF + AOS (40 min)

 Kawamura: ''IOO'' (40 min)

 Takahashi: ''VIS'' (30 min)

'''Meeting of International Board of Representatives'''
Line 41: Line 55:
   - Chair: Falaminio* - - Chair: Falaminio -
Line 45: Line 59:
Jean-Yves Vinet   (45 minutes)  Jean-Yves Vinet: (45 minutes)
Line 47: Line 61:
Yuri Levin (45 minutes)  Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers''(45 minutes)
Line 49: Line 63:
        ''Coffee Break (11:00-11:20) '' ''Coffee Break (11:00-11:20) ''
Line 51: Line 65:
   - Chair: Miyakawa - - Chair: Miyakawa -
Line 53: Line 67:
Progress report        (160 minutes in total) Progress report 1 (50 min)
Line 59: Line 73:
        ''Lunch Break (12:10-13:30) '' ''Lunch Break (12:10-13:40) ''
Line 61: Line 75:
   - Chair: Uchiyama - - Chair: Uchiyama -
Line 63: Line 77:
Cryo-payload: cool-down process of a sapphire mirror (20 min) - Progress Report 2 (110 min)

Cryo-payload: cool-down process of a sapphire mirror (20 min)
Line 67: Line 83:
Geophysics IF: corner-cube reflector (20 min)  Akito Araya and Akiteru Takamori: Geophysics IF ''Observation system and optics configuration''(20 min)

''Coffee Break (14:40-15:00) ''
Line 71: Line 89:
        ''Coffee Break (14:55-15:15) ''  Daniel Friedrich: ''Auxiliary optics, BRT design'' (25 min)
Line 73: Line 91:
Auxiliary optics: BRT design (25 min) - Chair: Somiya -
Line 75: Line 93:
    - Chair: Akutsu - Advanced R&D (60 min)
Line 77: Line 95:
Subsystem Report-1 (80 minutes)  TBD
Line 79: Line 97:
TUN, FCL, DetChar

        ''Banquet''
''Banquet''
Line 85: Line 101:
   - Chair: Hyun-Won Lee - - Chair: Hyun-Won Lee -
Line 87: Line 103:
Subsystem Report-2 (90 minutes) Subsystem Report-2 (90 minutes)    
Line 89: Line 105:
DAS, DMG, DGS/AEL  DetChar, DAS, DMG
Line 91: Line 107:
        ''Coffee Break (11:00-11:20) '' ''Coffee Break (11:00-11:20) ''
Line 93: Line 109:
   - Chair: Somiya* - Subsystem Report-3 (30 min)
Line 95: Line 111:
R&D report (30 minutes)  DGS/AEL

Program

First day (11:00 open)

- Chair: Kuroda -

Introduction of New members (30 min)

Project Status

  • Kajita: Status of the KAGRA Project (30 min)

    Saito: SEO report (15 min)

Lunch Break (11:45-13:15)

- Chair: Kanda -

Collaboration status + Membership (10 + 20 minutes)

  • Kanda: Policy of CPC (5 min)

    Flaminio: Co-authorship in other projects (5 min)

Subsystem Report-1 (30 min)

  • TUN, FCL

- Chair: Saito -

Installation and Commissioning Schedule (155 minutes)

Outline (20 min)

  • Kawamura: Commissioning of iKAGRA (10 min)

    Ohashi: TBD (10 min)

    Saito: VAC (25 min)

Coffee Break (15:00-15:20)

- Chair: Ando -

MIF + AOS (40 min)

  • Kawamura: IOO (40 min)

    Takahashi: VIS (30 min)

Meeting of International Board of Representatives

Second day (9:30-17:00+ Banquet)

- Chair: Falaminio -

Invited talks (90 minutes)

  • Jean-Yves Vinet: (45 minutes)

    Yuri Levin: Reciprocity relationships for gravitational-waves interferometers(45 minutes)

Coffee Break (11:00-11:20)

- Chair: Miyakawa -

Progress report 1 (50 min)

Cryo-payload: suspension structure (25 min)

Cryo-payload: vibration reduction (25 min)

Lunch Break (12:10-13:40)

- Chair: Uchiyama -

Progress Report 2 (110 min)

Cryo-payload: cool-down process of a sapphire mirror (20 min)

Input optics: Fiber-ring cavity (20 min)

  • Akito Araya and Akiteru Takamori: Geophysics IF Observation system and optics configuration(20 min)

Coffee Break (14:40-15:00)

Mirror: sapphire mirror characteristics (25 min)

  • Daniel Friedrich: Auxiliary optics, BRT design (25 min)

- Chair: Somiya -

Advanced R&D (60 min)

  • TBD

Banquet

Third day (9:30-12:00)

- Chair: Hyun-Won Lee -

Subsystem Report-2 (90 minutes)

Coffee Break (11:00-11:20)

Subsystem Report-3 (30 min)

  • DGS/AEL

Concluding Remark (10 minutes)

LCGT/Meeting/f2f/2014Feb (last edited 2017-05-10 17:02:46 by YousukeIto)