Differences between revisions 2 and 17 (spanning 15 versions)
Revision 2 as of 2014-01-10 10:21:27
Size: 1204
Comment:
Revision 17 as of 2014-01-20 11:10:08
Size: 1907
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
LCGT/Meeting/f2f/2014Febについて、ここに記述してください。
Program (tentative)
= Program =
Line 4: Line 3:
First day (11:00 open) '''First day (11:00 open)'''
                                     
Line 6: Line 6:
1. Introduction of New member (Poland + Hanoi + ?) + New members invited by subsystem chief (30 minutes)     - Chair: Kuroda -
Line 8: Line 8:
2. Project Status                  (30 minutes) Introduction of New members (30 minutes)  
Line 10: Line 10:
---Lunch Break--- Project Status (30 minutes)
Line 12: Line 12:
3. SEO report (50 minutes)         ''Lunch Break (12:00-13:30) ''
Line 14: Line 14:
4. Collaboration status + Membership (10 + 20 minutes)    - Chair: Kanda -
Line 16: Line 16:
---Coffee Break--- SEO report (15 minutes)
Line 18: Line 18:
5. Discussion of Installation (90 minutes) Collaboration status + Membership (10 + 20 minutes)
Line 20: Line 20:
Installation and Commissioning Schedule (155 minutes in total)
Line 21: Line 22:
---Meeting of International Board of Representatives Outline (20 minutes)
Line 23: Line 24:
Second day (9:00-17:00+ Banquet) VAC (25 minutes)
Line 25: Line 26:
1. Invited talks: Jean-Yves Vinet, Yuri Levin (45 + 45 minutes)         ''Coffee Break (15:00-15:20) ''
Line 27: Line 28:
---Coffee Break---   - Chair: Ando -
Line 29: Line 30:
2. Subsystem report I (120 minutes) MIF + AOS (40 minutes)
Line 31: Line 32:
---Lunch Break--- IOO (40 minutes)
Line 33: Line 34:
3. Subsystem Report II (120 minutes) VIS (30 minutes)
Line 35: Line 36:
----Coffee Break---         '''Meeting of International Board of Representatives'''
Line 37: Line 38:
4. Subsystem Report III (120 minutes) '''Second day (9:30-17:00+ Banquet)'''
Line 39: Line 40:
---Banquet---    - Chair: Falaminio -
Line 41: Line 42:
Third day (9:00-12:00) Invited talks (90 minutes)
Line 43: Line 44:
1. Subsystem Report IV (120 minutes) Jean-Yves Vinet (45 minutes)
Line 45: Line 46:
----Coffee Break--- Yuri Levin (45 minutes)
Line 47: Line 48:
2. Others + Information (30 minutes)         ''Coffee Break (11:00-11:20) ''
Line 49: Line 50:
3. Concluding Remark (10 minutes)    - Chair: Miyakawa -

Progress report (160 minutes in total)

Cryo-payload: suspension structure (25 min)

Cryo-payload: vibration reduction (25 min)

        ''Lunch Break (12:10-13:30) ''

   - Chair: Uchiyama -

Cryo-payload: cool-down process of a sapphire mirror (20 min) -

Input optics: Fiber-ring cavity (20 min)

Geophysics IF: corner-cube reflector (20 min)

Mirror: sapphire mirror characteristics (25 min)

        ''Coffee Break (14:55-15:15) ''

Auxiliary optics: BRT design (25 min)

    - Chair: Akutsu -

Subsystem Report-1 (80 minutes)

TUN, FCL, DetChar

        ''Banquet''

'''Third day (9:30-12:00)'''

   - Chair: Hyun-Won Lee -

Subsystem Report-2 (90 minutes)

DAS, DMG, DGS/AEL

        ''Coffee Break (11:00-11:20) ''

   - Chair: Somiya -

R&D report (30 minutes)

Concluding Remark (10 minutes)

Program

First day (11:00 open)

  • - Chair: Kuroda -

Introduction of New members (30 minutes)

Project Status (30 minutes)

  • Lunch Break (12:00-13:30)

  • - Chair: Kanda -

SEO report (15 minutes)

Collaboration status + Membership (10 + 20 minutes)

Installation and Commissioning Schedule (155 minutes in total)

Outline (20 minutes)

VAC (25 minutes)

  • Coffee Break (15:00-15:20)

  • - Chair: Ando -

MIF + AOS (40 minutes)

IOO (40 minutes)

VIS (30 minutes)

  • Meeting of International Board of Representatives

Second day (9:30-17:00+ Banquet)

  • - Chair: Falaminio -

Invited talks (90 minutes)

Jean-Yves Vinet (45 minutes)

Yuri Levin (45 minutes)

  • Coffee Break (11:00-11:20)

  • - Chair: Miyakawa -

Progress report (160 minutes in total)

Cryo-payload: suspension structure (25 min)

Cryo-payload: vibration reduction (25 min)

  • Lunch Break (12:10-13:30)

  • - Chair: Uchiyama -

Cryo-payload: cool-down process of a sapphire mirror (20 min) -

Input optics: Fiber-ring cavity (20 min)

Geophysics IF: corner-cube reflector (20 min)

Mirror: sapphire mirror characteristics (25 min)

  • Coffee Break (14:55-15:15)

Auxiliary optics: BRT design (25 min)

  • - Chair: Akutsu -

Subsystem Report-1 (80 minutes)

TUN, FCL, DetChar

  • Banquet

Third day (9:30-12:00)

  • - Chair: Hyun-Won Lee -

Subsystem Report-2 (90 minutes)

DAS, DMG, DGS/AEL

  • Coffee Break (11:00-11:20)

  • - Chair: Somiya -

R&D report (30 minutes)

Concluding Remark (10 minutes)

LCGT/Meeting/f2f/2014Feb (last edited 2017-05-10 17:02:46 by YousukeIto)