Differences between revisions 23 and 52 (spanning 29 versions)
Revision 23 as of 2014-01-25 12:45:02
Size: 2353
Comment:
Revision 52 as of 2014-02-10 19:41:48
Size: 2980
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
'''First day (11:00 open)''' '''Thursday, February 13 (11:00-17:25 + IBR meeting)'''
Line 5: Line 5:
    - Chair: Kuroda - - Chair: Kuroda - 
Line 7: Line 7:
Introduction of New members        (30 min)  ''Introduction of New members'' (30 min)
Line 9: Line 9:
Project Status Project Status (45 min)
Line 11: Line 11:
   Kajita: ''Status of the KAGRA Project'' (30 min)  Kajita: ''Status of the KAGRA Project'' (30 min)
Line 13: Line 13:
   Saito: ''SEO report'' (15 min)   Saito: ''SEO report'' (15 min)
Line 15: Line 15:
  ''Lunch Break (12:15-13:30) ''
Line 17: Line 17:
       ''Lunch Break (11:45-13:15) '' - Chair: Kanda -
Line 19: Line 19:
Collaboration status + Membership (10 + 20 min)
Line 20: Line 21:
   - Chair: Kanda -  Kanda: ''Policy of CPC'' (5 min)
Line 22: Line 23:
Collaboration status + Membership (10 + 20 minutes)  Flaminio: ''Co-authorship in other projects'' (5 min)
Line 24: Line 25:
   Kanda: ''Policy of CPC'' (5 min) - Chair: Saito -
Line 26: Line 27:
   Flaminio: ''Co-authorship in other projects'' (5 min) Installation and Commissioning Schedule (155 min)
Line 28: Line 29:
Subsystem Report-1 (30 min)  Saito: ''Installation of iKAGRA / Outline'' (10 min)
Line 30: Line 31:
   TUN, FCL  Kawamura: ''Commissioning of iKAGRA'' (10 min)
Line 32: Line 33:
 Miyoki: ''TUN + FCL ''(30 min)
Line 33: Line 35:
  - Chair: Saito -  Saito: ''VAC'' (25 min)
Line 35: Line 37:
Installation and Commissioning Schedule (155 minutes) ''Coffee Break (15:15-15:35) ''
Line 37: Line 39:
Outline (20 min) - Chair: Ando -
Line 39: Line 41:
   Kawamura: ''Commissioning of iKAGRA'' (10 min)  Takahashi: ''VIS'' (30 min)
Line 41: Line 43:
   Ohashi: TBD (10 min)  Kawamura: ''IOO Overvirew'' (30 min)
Line 43: Line 45:
   Saito: ''VAC'' (25 min)  Nakano & Somiya: ''IOO Faraday Isolator'' (10 min)
Line 45: Line 47:
 Aso: ''MIF installation and commissioning plan'' (20 min)
Line 46: Line 49:
 Akutsu: '' Installation schedule of AOS'' (20 min)
Line 47: Line 51:
        ''Coffee Break (15:00-15:20) '' '''Meeting of International Board of Representatives'''
Line 49: Line 53:
  - Chair: Ando - '''Friday, February 14 (9:30-17:00+ Banquet)'''
Line 51: Line 55:
MIF + AOS (40 min)

    Kawamura: ''IOO'' (40 min)

    Takahashi: ''VIS'' (30 min)


        '''Meeting of International Board of Representatives'''



'''Second day (9:30-17:00+ Banquet)'''

   - Chair: Falaminio -
- Chair: Flaminio -
Line 68: Line 59:
   Jean-Yves Vinet: (45 minutes)  Jean-Yves Vinet: ''Features and present status of the Advanced Virgo Antenna'' (45 minutes)
Line 70: Line 61:
   Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers''(45 minutes)  Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers'' (45 minutes)
Line 72: Line 63:
''Coffee Break (11:00-11:20) ''
Line 73: Line 65:

        ''Coffee Break (11:00-11:20) ''

   - Chair: Miyakawa -
- Chair: Miyakawa -
Line 80: Line 69:
Cryo-payload: suspension structure (25 min)  Yamamoto: ''Cryo-payload; suspension structure'' (30 min)
Line 82: Line 71:
Cryo-payload: vibration reduction (25 min)  Chen Dan: ''Cryo-payload; vibration reduction'' (20 min)
Line 84: Line 73:
''Lunch Break (12:10-13:40) ''
Line 85: Line 75:

        ''Lunch Break (12:10-13:40) ''

   - Chair: Uchiyama -
- Chair: Uchiyama -
Line 92: Line 79:
Cryo-payload: cool-down process of a sapphire mirror (20 min) -  Sakakibara: ''Cryo-payload; cool-down process of a sapphire mirror'' (20 min)
Line 94: Line 81:
Input optics: Fiber-ring cavity (20 min)  Tai Hyun Yoon: ''Frequency-stabilized laser sources for iKAGRA'' (20 min)
Line 96: Line 83:
     Akito Araya and Akiteru Takamori: Geophysics IF ''Observation system and optics configuration''(20 min)  Akito Araya and Akiteru Takamori: ''Geophysics IF; Observation system and optics configuration'' (20 min)
Line 98: Line 85:
  ''Coffee Break (14:40-15:00) ''
Line 100: Line 87:
       ''Coffee Break (14:40-15:00) ''  Mirror: ''sapphire mirror characteristics'' (25 min)
Line 102: Line 89:
Mirror: sapphire mirror characteristics (25 min)  Daniel Friedrich: ''Auxiliary optics, BRT design'' (25 min)
Line 104: Line 91:
     Daniel Friedrich: ''Auxiliary optics, BRT design''(25 min)

   - Chair: Somiya -
- Chair: Somiya -
Line 110: Line 95:
   TBD  Kazunori Shibata: ''Thermal noise in a non-equilibrium state'' (20 min)
 
 Fumiko Kawazoe: ''Our 10m Interferometer Prototype'' (20 min)
Line 112: Line 99:
        ''Banquet''  Kentaro Somiya: ''Squeezing for KAGRA'' (20 min)
Line 114: Line 101:
'''Third day (9:30-12:00)''' ''Banquet''
Line 116: Line 103:
   - Chair: Hyun-Won Lee - '''Saturday, February 15 (9:30-12:00)'''
Line 118: Line 105:
Subsystem Report-2 (90 minutes) - Chair: Hyun-Won Lee -
Line 120: Line 107:
DetChar, DAS, DMG Subsystem Report-1 (90 minutes)
Line 122: Line 109:
 DetChar: ''Takahiro Yamamoto, Status of KAGRA detector characterization ''
 
 Hideyuki Tagoshi: ''Status of Data Analysis Subsystem''
Line 123: Line 113:
 Nobuyuki Kanda : ''Status of Data Management Subsystem : iKAGRA data system, Data Tier plan''
Line 124: Line 115:
        ''Coffee Break (11:00-11:20) '' ''Coffee Break (11:00-11:20) ''
Line 126: Line 117:
   - Chair Akutsu - Subsystem Report-2 (30 min)
Line 128: Line 119:
Subsystem Report-3 (30 min)  DGS '' ''
Line 130: Line 121:
DGS/AEL    AEL '' ''
Line 133: Line 124:

---- /!\ '''End of edit conflict''' ----

Program

Thursday, February 13 (11:00-17:25 + IBR meeting)

- Chair: Kuroda -

  • Introduction of New members (30 min)

Project Status (45 min)

  • Kajita: Status of the KAGRA Project (30 min)

    Saito: SEO report (15 min)

Lunch Break (12:15-13:30)

- Chair: Kanda -

Collaboration status + Membership (10 + 20 min)

  • Kanda: Policy of CPC (5 min)

    Flaminio: Co-authorship in other projects (5 min)

- Chair: Saito -

Installation and Commissioning Schedule (155 min)

  • Saito: Installation of iKAGRA / Outline (10 min)

    Kawamura: Commissioning of iKAGRA (10 min)

    Miyoki: TUN + FCL (30 min)

    Saito: VAC (25 min)

Coffee Break (15:15-15:35)

- Chair: Ando -

  • Takahashi: VIS (30 min)

    Kawamura: IOO Overvirew (30 min)

    Nakano & Somiya: IOO Faraday Isolator (10 min)

    Aso: MIF installation and commissioning plan (20 min)

    Akutsu: Installation schedule of AOS (20 min)

Meeting of International Board of Representatives

Friday, February 14 (9:30-17:00+ Banquet)

- Chair: Flaminio -

Invited talks (90 minutes)

  • Jean-Yves Vinet: Features and present status of the Advanced Virgo Antenna (45 minutes)

    Yuri Levin: Reciprocity relationships for gravitational-waves interferometers (45 minutes)

Coffee Break (11:00-11:20)

- Chair: Miyakawa -

Progress report 1 (50 min)

  • Yamamoto: Cryo-payload; suspension structure (30 min)

    Chen Dan: Cryo-payload; vibration reduction (20 min)

Lunch Break (12:10-13:40)

- Chair: Uchiyama -

Progress Report 2 (110 min)

  • Sakakibara: Cryo-payload; cool-down process of a sapphire mirror (20 min)

    Tai Hyun Yoon: Frequency-stabilized laser sources for iKAGRA (20 min)

    Akito Araya and Akiteru Takamori: Geophysics IF; Observation system and optics configuration (20 min)

Coffee Break (14:40-15:00)

  • Mirror: sapphire mirror characteristics (25 min)

    Daniel Friedrich: Auxiliary optics, BRT design (25 min)

- Chair: Somiya -

Advanced R&D (60 min)

  • Kazunori Shibata: Thermal noise in a non-equilibrium state (20 min)

    Fumiko Kawazoe: Our 10m Interferometer Prototype (20 min)

    Kentaro Somiya: Squeezing for KAGRA (20 min)

Banquet

Saturday, February 15 (9:30-12:00)

- Chair: Hyun-Won Lee -

Subsystem Report-1 (90 minutes)

  • DetChar: Takahiro Yamamoto, Status of KAGRA detector characterization

    Hideyuki Tagoshi: Status of Data Analysis Subsystem

    Nobuyuki Kanda : Status of Data Management Subsystem : iKAGRA data system, Data Tier plan

Coffee Break (11:00-11:20)

Subsystem Report-2 (30 min)

  • DGS

    AEL

Concluding Remark (10 minutes)


/!\ End of edit conflict


LCGT/Meeting/f2f/2014Feb (last edited 2017-05-10 17:02:46 by YousukeIto)