2353
Comment:
|
3011
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
'''First day (11:00 open)''' | '''Thursday, February 13 (11:00-17:25 + IBR meeting)''' |
Line 5: | Line 5: |
- Chair: Kuroda - | - Chair: Kuroda - |
Line 7: | Line 7: |
Introduction of New members (30 min) | ''Introduction of New members'' (30 min) |
Line 9: | Line 9: |
Project Status | Project Status (45 min) |
Line 11: | Line 11: |
Kajita: ''Status of the KAGRA Project'' (30 min) | Kajita: ''Status of the KAGRA Project'' (30 min) |
Line 13: | Line 13: |
Saito: ''SEO report'' (15 min) | Saito: ''SEO report'' (15 min) |
Line 15: | Line 15: |
''Lunch Break (12:15-13:30) '' | |
Line 17: | Line 17: |
''Lunch Break (11:45-13:15) '' | - Chair: Kanda - |
Line 19: | Line 19: |
Collaboration status + Membership (10 + 20 min) | |
Line 20: | Line 21: |
- Chair: Kanda - | Kanda: ''Policy of CPC'' (5 min) |
Line 22: | Line 23: |
Collaboration status + Membership (10 + 20 minutes) | Flaminio: ''Co-authorship in other projects'' (5 min) |
Line 24: | Line 25: |
Kanda: ''Policy of CPC'' (5 min) | - Chair: Saito - |
Line 26: | Line 27: |
Flaminio: ''Co-authorship in other projects'' (5 min) | Installation and Commissioning Schedule (155 min) |
Line 28: | Line 29: |
Subsystem Report-1 (30 min) | Saito: ''Installation of iKAGRA / Outline'' (10 min) |
Line 30: | Line 31: |
TUN, FCL | Kawamura: ''Commissioning of iKAGRA'' (10 min) |
Line 32: | Line 33: |
Miyoki: ''TUN + FCL ''(30 min) | |
Line 33: | Line 35: |
- Chair: Saito - | Saito: ''VAC'' (25 min) |
Line 35: | Line 37: |
Installation and Commissioning Schedule (155 minutes) | ''Coffee Break (15:15-15:35) '' |
Line 37: | Line 39: |
Outline (20 min) | - Chair: Ando - |
Line 39: | Line 41: |
Kawamura: ''Commissioning of iKAGRA'' (10 min) | Takahashi: ''VIS'' (30 min) |
Line 41: | Line 43: |
Ohashi: TBD (10 min) | Kawamura: ''IOO Overvirew'' (30 min) |
Line 43: | Line 45: |
Saito: ''VAC'' (25 min) | Nakano & Somiya: ''IOO Faraday Isolator'' (10 min) |
Line 45: | Line 47: |
Aso: ''MIF installation and commissioning plan'' (20 min) | |
Line 46: | Line 49: |
Akutsu: '' Installation schedule of AOS'' (20 min) | |
Line 47: | Line 51: |
''Coffee Break (15:00-15:20) '' | '''Meeting of International Board of Representatives''' |
Line 49: | Line 53: |
- Chair: Ando - | '''Friday, February 14 (9:30-17:00+ Banquet)''' |
Line 51: | Line 55: |
MIF + AOS (40 min) Kawamura: ''IOO'' (40 min) Takahashi: ''VIS'' (30 min) '''Meeting of International Board of Representatives''' '''Second day (9:30-17:00+ Banquet)''' - Chair: Falaminio - |
- Chair: Flaminio - |
Line 68: | Line 59: |
Jean-Yves Vinet: (45 minutes) | Jean-Yves Vinet: ''Features and present status of the Advanced Virgo Antenna'' (45 minutes) |
Line 70: | Line 61: |
Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers''(45 minutes) | Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers'' (45 minutes) |
Line 72: | Line 63: |
''Coffee Break (11:00-11:20) '' | |
Line 73: | Line 65: |
''Coffee Break (11:00-11:20) '' - Chair: Miyakawa - |
- Chair: Miyakawa - |
Line 80: | Line 69: |
Cryo-payload: suspension structure (25 min) | Yamamoto: ''Cryo-payload; suspension structure'' (30 min) |
Line 82: | Line 71: |
Cryo-payload: vibration reduction (25 min) | Chen Dan: ''Cryo-payload; vibration reduction'' (20 min) |
Line 84: | Line 73: |
''Lunch Break (12:10-13:40) '' | |
Line 85: | Line 75: |
''Lunch Break (12:10-13:40) '' - Chair: Uchiyama - |
- Chair: Uchiyama - |
Line 92: | Line 79: |
Cryo-payload: cool-down process of a sapphire mirror (20 min) - | Sakakibara: ''Cryo-payload; cool-down process of a sapphire mirror'' (20 min) |
Line 94: | Line 81: |
Input optics: Fiber-ring cavity (20 min) | Tai Hyun Yoon: ''Frequency-stabilized laser sources for iKAGRA'' (20 min) |
Line 96: | Line 83: |
Akito Araya and Akiteru Takamori: Geophysics IF ''Observation system and optics configuration''(20 min) | Akito Araya and Akiteru Takamori: ''Geophysics IF; Observation system and optics configuration'' (20 min) |
Line 98: | Line 85: |
''Coffee Break (14:40-15:00) '' | |
Line 100: | Line 87: |
''Coffee Break (14:40-15:00) '' | Mirror: ''sapphire mirror characteristics'' (25 min) |
Line 102: | Line 89: |
Mirror: sapphire mirror characteristics (25 min) | Daniel Friedrich: ''Auxiliary optics, BRT design'' (25 min) |
Line 104: | Line 91: |
Daniel Friedrich: ''Auxiliary optics, BRT design''(25 min) - Chair: Somiya - |
- Chair: Somiya - |
Line 110: | Line 95: |
TBD | Kazunori Shibata: ''Thermal noise in a non-equilibrium state'' (20 min) Fumiko Kawazoe: ''Our 10m Interferometer Prototype'' (20 min) |
Line 112: | Line 99: |
''Banquet'' | Kentaro Somiya: ''Squeezing for KAGRA'' (20 min) |
Line 114: | Line 101: |
'''Third day (9:30-12:00)''' | ''Banquet'' |
Line 116: | Line 103: |
- Chair: Hyun-Won Lee - | '''Saturday, February 15 (9:30-12:00)''' |
Line 118: | Line 105: |
Subsystem Report-2 (90 minutes) | - Chair: Hyun-Won Lee - |
Line 120: | Line 107: |
DetChar, DAS, DMG | Subsystem Report-1 (90 minutes) |
Line 122: | Line 109: |
DetChar: ''Takahiro Yamamoto, Status of KAGRA detector characterization '' Hideyuki Tagoshi: ''Status of Data Analysis Subsystem'' |
|
Line 123: | Line 113: |
Nobuyuki Kanda : ''Status of Data Management Subsystem : iKAGRA data system, Data Tier plan'' | |
Line 124: | Line 115: |
''Coffee Break (11:00-11:20) '' | ''Coffee Break (11:00-11:20) '' |
Line 126: | Line 117: |
- Chair Akutsu - | Subsystem Report-2 (30 min) |
Line 128: | Line 119: |
Subsystem Report-3 (30 min) | DGS ''Installation plan for DAQ and control system'' |
Line 130: | Line 121: |
DGS/AEL | AEL ''Manufacturing schedule for analog circuits'' |
Program
Thursday, February 13 (11:00-17:25 + IBR meeting)
- Chair: Kuroda -
Introduction of New members (30 min)
Project Status (45 min)
Kajita: Status of the KAGRA Project (30 min)
Saito: SEO report (15 min)
Lunch Break (12:15-13:30)
- Chair: Kanda -
Collaboration status + Membership (10 + 20 min)
Kanda: Policy of CPC (5 min)
Flaminio: Co-authorship in other projects (5 min)
- Chair: Saito -
Installation and Commissioning Schedule (155 min)
Saito: Installation of iKAGRA / Outline (10 min)
Kawamura: Commissioning of iKAGRA (10 min)
Miyoki: TUN + FCL (30 min)
Saito: VAC (25 min)
Coffee Break (15:15-15:35)
- Chair: Ando -
Takahashi: VIS (30 min)
Kawamura: IOO Overvirew (30 min)
Nakano & Somiya: IOO Faraday Isolator (10 min)
Aso: MIF installation and commissioning plan (20 min)
Akutsu: Installation schedule of AOS (20 min)
Meeting of International Board of Representatives
Friday, February 14 (9:30-17:00+ Banquet)
- Chair: Flaminio -
Invited talks (90 minutes)
Jean-Yves Vinet: Features and present status of the Advanced Virgo Antenna (45 minutes)
Yuri Levin: Reciprocity relationships for gravitational-waves interferometers (45 minutes)
Coffee Break (11:00-11:20)
- Chair: Miyakawa -
Progress report 1 (50 min)
Yamamoto: Cryo-payload; suspension structure (30 min)
Chen Dan: Cryo-payload; vibration reduction (20 min)
Lunch Break (12:10-13:40)
- Chair: Uchiyama -
Progress Report 2 (110 min)
Sakakibara: Cryo-payload; cool-down process of a sapphire mirror (20 min)
Tai Hyun Yoon: Frequency-stabilized laser sources for iKAGRA (20 min)
Akito Araya and Akiteru Takamori: Geophysics IF; Observation system and optics configuration (20 min)
Coffee Break (14:40-15:00)
Mirror: sapphire mirror characteristics (25 min)
Daniel Friedrich: Auxiliary optics, BRT design (25 min)
- Chair: Somiya -
Advanced R&D (60 min)
Kazunori Shibata: Thermal noise in a non-equilibrium state (20 min)
Fumiko Kawazoe: Our 10m Interferometer Prototype (20 min)
Kentaro Somiya: Squeezing for KAGRA (20 min)
Banquet
Saturday, February 15 (9:30-12:00)
- Chair: Hyun-Won Lee -
Subsystem Report-1 (90 minutes)
DetChar: Takahiro Yamamoto, Status of KAGRA detector characterization
Hideyuki Tagoshi: Status of Data Analysis Subsystem
Nobuyuki Kanda : Status of Data Management Subsystem : iKAGRA data system, Data Tier plan
Coffee Break (11:00-11:20)
Subsystem Report-2 (30 min)
DGS Installation plan for DAQ and control system
AEL Manufacturing schedule for analog circuits
Concluding Remark (10 minutes)