2197
Comment:
|
2707
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
'''First day (11:00 open)''' | '''Thursday, February 13 (11:00-17:25 + IBR meeting)''' |
Line 5: | Line 5: |
- Chair: Kuroda - | - Chair: Kuroda - |
Line 7: | Line 7: |
Introduction of New members (30 min) | ''Introduction of New members'' (30 min) |
Line 9: | Line 9: |
Project Status | Project Status (45 min) |
Line 13: | Line 13: |
Saito: ''SEO report'' (15 min) | Saito: ''SEO report'' (15 min) |
Line 15: | Line 15: |
''Lunch Break (11:45-13:15) '' | ''Lunch Break (12:15-13:30) '' |
Line 17: | Line 17: |
- Chair: Kanda - | - Chair: Kanda - |
Line 19: | Line 19: |
Collaboration status + Membership (10 + 20 minutes) | Collaboration status + Membership (10 + 20 min) |
Line 25: | Line 25: |
Subsystem Report-1 (30 min) | - Chair: Saito - |
Line 27: | Line 27: |
TUN, FCL | Installation and Commissioning Schedule (155 min) |
Line 29: | Line 29: |
- Chair: Saito - Installation and Commissioning Schedule (155 minutes) Outline (20 min) |
Saito: ''Installation of iKAGRA / Outline'' (10 min) |
Line 37: | Line 33: |
Ohashi: TBD (10 min) | Miyoki: ''TUN + FCL ''(30 min) |
Line 41: | Line 37: |
''Coffee Break (15:00-15:20) '' | ''Coffee Break (15:15-15:35) '' |
Line 43: | Line 39: |
- Chair: Ando - | - Chair: Ando - |
Line 45: | Line 41: |
MIF + AOS (40 min) | TBD: ''MIF + AOS'' (40 min) |
Line 53: | Line 49: |
'''Second day (9:30-17:00+ Banquet)''' - Chair: Falaminio - |
'''Friday, February 14 (9:30-17:00+ Banquet)''' - Chair: Flaminio - |
Line 58: | Line 55: |
Jean-Yves Vinet: (45 minutes) | Jean-Yves Vinet: ''Features and present status of the Advanced Virgo Antenna'' (45 minutes) |
Line 60: | Line 57: |
Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers''(45 minutes) | Yuri Levin: ''Reciprocity relationships for gravitational-waves interferometers'' (45 minutes) |
Line 64: | Line 61: |
- Chair: Miyakawa - | - Chair: Miyakawa - |
Line 68: | Line 65: |
Cryo-payload: suspension structure (25 min) | Yamamoto: ''Cryo-payload; suspension structure'' (30 min) |
Line 70: | Line 67: |
Cryo-payload: vibration reduction (25 min) | Chen Dan: ''Cryo-payload; vibration reduction'' (20 min) |
Line 74: | Line 71: |
- Chair: Uchiyama - | - Chair: Uchiyama - |
Line 78: | Line 75: |
Cryo-payload: cool-down process of a sapphire mirror (20 min) - | Sakakibara: ''Cryo-payload; cool-down process of a sapphire mirror'' (20 min) |
Line 80: | Line 77: |
Input optics: Fiber-ring cavity (20 min) | Tai Hyun Yoon: ''Frequency-stabilized laser sources for iKAGRA'' (20 min) |
Line 82: | Line 79: |
Akito Araya and Akiteru Takamori: Geophysics IF ''Observation system and optics configuration''(20 min) | Akito Araya and Akiteru Takamori: ''Geophysics IF; Observation system and optics configuration'' (20 min) |
Line 86: | Line 83: |
Mirror: sapphire mirror characteristics (25 min) | Mirror: ''sapphire mirror characteristics'' (25 min) |
Line 88: | Line 85: |
Daniel Friedrich: ''Auxiliary optics, BRT design''(25 min) | Daniel Friedrich: ''Auxiliary optics, BRT design'' (25 min) |
Line 90: | Line 87: |
- Chair: Somiya - | - Chair: Somiya - |
Line 94: | Line 91: |
TBD | Kazunori Shibata: ''Thermal noise in a non-equilibrium state'' (20 min) Fumiko Kawazoe: ''Our 10m Interferometer Prototype'' (20 min) Kentaro Somiya: ''Squeezing for KAGRA'' (20 min) |
Line 98: | Line 99: |
'''Third day (9:30-12:00)''' | '''Saturday, February 15 (9:30-12:00)''' |
Line 100: | Line 101: |
- Chair: Hyun-Won Lee - | - Chair: Hyun-Won Lee - |
Line 102: | Line 103: |
Subsystem Report-2 (90 minutes) | Subsystem Report-1 (90 minutes) |
Line 104: | Line 105: |
DetChar, DAS, DMG | DetChar: ''Takahiro Yamamoto, Status of KAGRA detector characterization '' DAS '' '' DMG '' '' |
Line 108: | Line 113: |
- Chair Akutsu - | Subsystem Report-2 (30 min) |
Line 110: | Line 115: |
Subsystem Report-3 (30 min) | DGS '' '' |
Line 112: | Line 117: |
DGS/AEL | AEL '' '' |
Line 115: | Line 120: |
---- /!\ '''End of edit conflict''' ---- |
Program
Thursday, February 13 (11:00-17:25 + IBR meeting)
- Chair: Kuroda -
Introduction of New members (30 min)
Project Status (45 min)
Kajita: Status of the KAGRA Project (30 min)
Saito: SEO report (15 min)
Lunch Break (12:15-13:30)
- Chair: Kanda -
Collaboration status + Membership (10 + 20 min)
Kanda: Policy of CPC (5 min)
Flaminio: Co-authorship in other projects (5 min)
- Chair: Saito -
Installation and Commissioning Schedule (155 min)
Saito: Installation of iKAGRA / Outline (10 min)
Kawamura: Commissioning of iKAGRA (10 min)
Miyoki: TUN + FCL (30 min)
Saito: VAC (25 min)
Coffee Break (15:15-15:35)
- Chair: Ando -
TBD: MIF + AOS (40 min)
Kawamura: IOO (40 min)
Takahashi: VIS (30 min)
Meeting of International Board of Representatives
Friday, February 14 (9:30-17:00+ Banquet)
- Chair: Flaminio -
Invited talks (90 minutes)
Jean-Yves Vinet: Features and present status of the Advanced Virgo Antenna (45 minutes)
Yuri Levin: Reciprocity relationships for gravitational-waves interferometers (45 minutes)
Coffee Break (11:00-11:20)
- Chair: Miyakawa -
Progress report 1 (50 min)
Yamamoto: Cryo-payload; suspension structure (30 min)
Chen Dan: Cryo-payload; vibration reduction (20 min)
Lunch Break (12:10-13:40)
- Chair: Uchiyama -
Progress Report 2 (110 min)
Sakakibara: Cryo-payload; cool-down process of a sapphire mirror (20 min)
Tai Hyun Yoon: Frequency-stabilized laser sources for iKAGRA (20 min)
Akito Araya and Akiteru Takamori: Geophysics IF; Observation system and optics configuration (20 min)
Coffee Break (14:40-15:00)
Mirror: sapphire mirror characteristics (25 min)
Daniel Friedrich: Auxiliary optics, BRT design (25 min)
- Chair: Somiya -
Advanced R&D (60 min)
Kazunori Shibata: Thermal noise in a non-equilibrium state (20 min)
Fumiko Kawazoe: Our 10m Interferometer Prototype (20 min)
Kentaro Somiya: Squeezing for KAGRA (20 min)
Banquet
Saturday, February 15 (9:30-12:00)
- Chair: Hyun-Won Lee -
Subsystem Report-1 (90 minutes)
DetChar: Takahiro Yamamoto, Status of KAGRA detector characterization
DAS
DMG
Coffee Break (11:00-11:20)
Subsystem Report-2 (30 min)
DGS
AEL
Concluding Remark (10 minutes)
End of edit conflict