Line 9: Line 9:
Project Status Project Status (45 min)
Line 19: Line 19:
 ''Collaboration status + Membership'' (10 + 20 minutes) Collaboration status + Membership (10 + 20 min)
Line 31: Line 31:
Installation and Commissioning Schedule Installation and Commissioning Schedule (155 min)
Line 55: Line 55:
- Chair: Falaminio - - Chair: Flaminio -
Line 69: Line 69:
 Cryo-payload: ''suspension structure'' (25 min)  Yamamoto: ''Cryo-payload; suspension structure'' (30 min)
Line 71: Line 71:
 Cryo-payload: ''vibration reduction'' (25 min)  Chen Dan: ''Cryo-payload; vibration reduction'' (20 min)
Line 79: Line 79:
 Cryo-payload: ''cool-down process of a sapphire mirror'' (20 min)  Sakakibara: ''Cryo-payload; cool-down process of a sapphire mirror'' (20 min)
Line 81: Line 81:
 Input optics: ''Fiber-ring cavity'' (20 min)  Tai Hyun Yoon: ''Input optics, Fiber-ring cavity'' (20 min)
Line 83: Line 83:
 Akito Araya and Akiteru Takamori: Geophysics IF ''Observation system and optics configuration'' (20 min)  Akito Araya and Akiteru Takamori: ''Geophysics IF; Observation system and optics configuration'' (20 min)
Line 95: Line 95:
 TBD  Kazunori Shibata: ''Thermal noise in a non-equilibrium state'' (25 min)
 
 Kentaro Somiya: ''Squeezing for KAGRA'' (20 min)

 ''TBD''
Line 111: Line 115:
 DGS/AEL  DGS, AEL
Line 114: Line 118:

---- /!\ '''End of edit conflict''' ----

Program

First day (11:00 open)

- Chair: Kuroda -

  • Introduction of New members (30 min)

Project Status (45 min)

  • Kajita: Status of the KAGRA Project (30 min)

    Saito: SEO report (15 min)

Lunch Break (11:45-13:15)

- Chair: Kanda -

Collaboration status + Membership (10 + 20 min)

  • Kanda: Policy of CPC (5 min)

    Flaminio: Co-authorship in other projects (5 min)

Subsystem Report-1 (30 min)

  • TUN, FCL

- Chair: Saito -

Installation and Commissioning Schedule (155 min)

  • Outline (20 min)

    Kawamura: Commissioning of iKAGRA (10 min)

    Ohashi: TBD (10 min)

    Saito: VAC (25 min)

Coffee Break (15:00-15:20)

- Chair: Ando -

  • MIF + AOS (40 min)

    Kawamura: IOO (40 min)

    Takahashi: VIS (30 min)

Meeting of International Board of Representatives

Second day (9:30-17:00+ Banquet)

- Chair: Flaminio -

Invited talks (90 minutes)

  • Jean-Yves Vinet: (45 minutes)

    Yuri Levin: Reciprocity relationships for gravitational-waves interferometers(45 minutes)

Coffee Break (11:00-11:20)

- Chair: Miyakawa -

Progress report 1 (50 min)

  • Yamamoto: Cryo-payload; suspension structure (30 min)

    Chen Dan: Cryo-payload; vibration reduction (20 min)

Lunch Break (12:10-13:40)

- Chair: Uchiyama -

Progress Report 2 (110 min)

  • Sakakibara: Cryo-payload; cool-down process of a sapphire mirror (20 min)

    Tai Hyun Yoon: Input optics, Fiber-ring cavity (20 min)

    Akito Araya and Akiteru Takamori: Geophysics IF; Observation system and optics configuration (20 min)

Coffee Break (14:40-15:00)

  • Mirror: sapphire mirror characteristics (25 min)

    Daniel Friedrich: Auxiliary optics, BRT design (25 min)

- Chair: Somiya -

Advanced R&D (60 min)

  • Kazunori Shibata: Thermal noise in a non-equilibrium state (25 min)

    Kentaro Somiya: Squeezing for KAGRA (20 min)

    TBD

Banquet

Third day (9:30-12:00)

- Chair: Hyun-Won Lee -

Subsystem Report-2 (90 minutes)

Coffee Break (11:00-11:20)

Subsystem Report-3 (30 min)

  • DGS, AEL

Concluding Remark (10 minutes)