Differences between revisions 37 and 38
Revision 37 as of 2014-01-27 15:19:35
Size: 2429
Comment:
Revision 38 as of 2014-01-28 17:31:51
Size: 2476
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
'''First day (11:00 open)''' '''Thursday, February 13 (11:00-17:25 + IBR meeting)'''
Line 15: Line 15:
''Lunch Break (11:45-13:15) '' ''Lunch Break (12:15-13:30) ''
Line 25: Line 25:
Subsystem Report-1 (30 min)

 TUN, FCL
Line 33: Line 29:
 ''Outline'' (20 min)  Saito: ''Installation of iKAGRA / Outline'' (10 min)
Line 37: Line 33:
 Ohashi: ''TBD'' (10 min)  Miyoki: ''TUN + FCL ''(30 min)
Line 41: Line 37:
''Coffee Break (15:00-15:20) '' ''Coffee Break (15:15-15:35) ''
Line 45: Line 41:
 ''MIF + AOS'' (40 min)  TBD: ''MIF + AOS'' (40 min)
Line 53: Line 49:
'''Second day (9:30-17:00+ Banquet)''' '''Friday, February 14 (9:30-17:00+ Banquet)'''
Line 103: Line 99:
'''Third day (9:30-12:00)''' '''Saturday, February 15 (9:30-12:00)'''
Line 107: Line 103:
Subsystem Report-2 (90 minutes) Subsystem Report-1 (90 minutes)
Line 113: Line 109:
Subsystem Report-3 (30 min) Subsystem Report-2 (30 min)

Program

Thursday, February 13 (11:00-17:25 + IBR meeting)

- Chair: Kuroda -

  • Introduction of New members (30 min)

Project Status (45 min)

  • Kajita: Status of the KAGRA Project (30 min)

    Saito: SEO report (15 min)

Lunch Break (12:15-13:30)

- Chair: Kanda -

Collaboration status + Membership (10 + 20 min)

  • Kanda: Policy of CPC (5 min)

    Flaminio: Co-authorship in other projects (5 min)

- Chair: Saito -

Installation and Commissioning Schedule (155 min)

  • Saito: Installation of iKAGRA / Outline (10 min)

    Kawamura: Commissioning of iKAGRA (10 min)

    Miyoki: TUN + FCL (30 min)

    Saito: VAC (25 min)

Coffee Break (15:15-15:35)

- Chair: Ando -

  • TBD: MIF + AOS (40 min)

    Kawamura: IOO (40 min)

    Takahashi: VIS (30 min)

Meeting of International Board of Representatives

Friday, February 14 (9:30-17:00+ Banquet)

- Chair: Flaminio -

Invited talks (90 minutes)

  • Jean-Yves Vinet: (45 minutes)

    Yuri Levin: Reciprocity relationships for gravitational-waves interferometers(45 minutes)

Coffee Break (11:00-11:20)

- Chair: Miyakawa -

Progress report 1 (50 min)

  • Yamamoto: Cryo-payload; suspension structure (30 min)

    Chen Dan: Cryo-payload; vibration reduction (20 min)

Lunch Break (12:10-13:40)

- Chair: Uchiyama -

Progress Report 2 (110 min)

  • Sakakibara: Cryo-payload; cool-down process of a sapphire mirror (20 min)

    Tai Hyun Yoon: Input optics, Fiber-ring cavity (20 min)

    Akito Araya and Akiteru Takamori: Geophysics IF; Observation system and optics configuration (20 min)

Coffee Break (14:40-15:00)

  • Mirror: sapphire mirror characteristics (25 min)

    Daniel Friedrich: Auxiliary optics, BRT design (25 min)

- Chair: Somiya -

Advanced R&D (60 min)

  • Kazunori Shibata: Thermal noise in a non-equilibrium state (25 min)

    Kentaro Somiya: Squeezing for KAGRA (20 min)

    TBD

Banquet

Saturday, February 15 (9:30-12:00)

- Chair: Hyun-Won Lee -

Subsystem Report-1 (90 minutes)

Coffee Break (11:00-11:20)

Subsystem Report-2 (30 min)

  • DGS, AEL

Concluding Remark (10 minutes)


/!\ End of edit conflict


LCGT/Meeting/f2f/2014Feb (last edited 2017-05-10 17:02:46 by YousukeIto)