Size: 1087
Comment:
|
Size: 1800
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Program (tentative) = | = Program = |
Line 5: | Line 5: |
Introduction of New member (Poland + Hanoi + ?) + New members (30 minutes) Project Status (30 minutes) ''Lunch Break'' SEO report (50 minutes) Collaboration status + Membership (10 + 20 minutes) ''Coffee Break'' Discussion of Installation (90 minutes) |
Introduction of New members (30 minutes) Chair: Kuroda |
Line 20: | Line 8: |
'''Meeting of International Board of Representatives''' | Project Status (30 minutes) |
Line 22: | Line 10: |
'''Second day (9:00-17:00+ Banquet)''' | ''Lunch Break (12:00-13:30) '' |
Line 24: | Line 12: |
Invited talks: Jean-Yves Vinet, Yuri Levin (45 + 45 minutes) | SEO report (15 minutes) Chair: Kanda* |
Line 26: | Line 14: |
''Coffee Break'' | Collaboration status + Membership (10 + 20 minutes) |
Line 28: | Line 16: |
Subsystem report I (120 minutes) | Installation and Commissioning Schedule (155 minutes in total) Chair: Saito* |
Line 30: | Line 18: |
''Lunch Break'' | Outline (20 minutes) |
Line 32: | Line 20: |
Subsystem Report II (120 minutes) | VAC (25 minutes) |
Line 34: | Line 22: |
''Coffee Break'' | ''Coffee Break (15:00-15:20) '' |
Line 36: | Line 24: |
Subsystem Report III (120 minutes) | MIF + AOS (40 minutes) |
Line 38: | Line 26: |
''Banquet'' | IOO (40 minutes) Chair: Ando* |
Line 40: | Line 28: |
'''Third day (9:00-12:00)''' | VIS (30 minutes) |
Line 42: | Line 30: |
Subsystem Report IV (120 minutes) | '''Meeting of International Board of Representatives''' |
Line 44: | Line 32: |
''Coffee Break'' | '''Second day (9:30-17:00+ Banquet)''' |
Line 46: | Line 34: |
Others + Information (30 minutes) | Invited talks (90 minutes) Chair: Falaminio* |
Line 48: | Line 36: |
Concluding Remark (10 minutes) | Jean-Yves Vinet (45 minutes) Yuri Levin (45 minutes) ''Coffee Break (11:00-11:20) '' Progress report (160 minutes in total) Chair: Miyakawa Cryo-payload: suspension structure (25 min) Cryo-payload: vibration reduction (25 min) ''Lunch Break (12:10-13:30) '' Cryo-payload: cool-down process of a sapphire mirror (20 min) Chair: Uchiyama Input optics: Fiber-ring cavity (20 min) Geophysics IF: corner-cube reflector (20 min) Mirror: sapphire mirror characteristics (25 min) ''Coffee Break (14:55-15:15) '' Auxiliary optics: BRT design (25 min) Subsystem Report-1 (80 minutes) Chair: Akutsu TUN, FCL, DetChar ''Banquet'' '''Third day (9:30-12:00)''' Subsystem Report-2 (90 minutes) Chair: Hyun-Won Lee DAS, DMG, DGS/AEL ''Coffee Break (11:00-11:20) '' R&D report (30 minutes) Chair: Somiya Concluding Remark (10 minutes) |
Program
First day (11:00 open)
Introduction of New members (30 minutes) Chair: Kuroda
Project Status (30 minutes)
Lunch Break (12:00-13:30)
SEO report (15 minutes) Chair: Kanda*
Collaboration status + Membership (10 + 20 minutes)
Installation and Commissioning Schedule (155 minutes in total) Chair: Saito*
Outline (20 minutes)
VAC (25 minutes)
Coffee Break (15:00-15:20)
MIF + AOS (40 minutes)
IOO (40 minutes) Chair: Ando*
VIS (30 minutes)
Meeting of International Board of Representatives
Second day (9:30-17:00+ Banquet)
Invited talks (90 minutes) Chair: Falaminio*
Jean-Yves Vinet (45 minutes)
Yuri Levin (45 minutes)
Coffee Break (11:00-11:20)
Progress report (160 minutes in total) Chair: Miyakawa
Cryo-payload: suspension structure (25 min)
Cryo-payload: vibration reduction (25 min)
Lunch Break (12:10-13:30)
Cryo-payload: cool-down process of a sapphire mirror (20 min) Chair: Uchiyama
Input optics: Fiber-ring cavity (20 min)
Geophysics IF: corner-cube reflector (20 min)
Mirror: sapphire mirror characteristics (25 min)
Coffee Break (14:55-15:15)
Auxiliary optics: BRT design (25 min)
Subsystem Report-1 (80 minutes) Chair: Akutsu
TUN, FCL, DetChar
Banquet
Third day (9:30-12:00)
Subsystem Report-2 (90 minutes) Chair: Hyun-Won Lee
DAS, DMG, DGS/AEL
Coffee Break (11:00-11:20)
R&D report (30 minutes) Chair: Somiya
Concluding Remark (10 minutes)