6297
Comment:
|
6102
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
---- /!\ '''Edit conflict - other version:''' ---- | |
Line 42: | Line 41: |
Takahashi: ''VIS'' (30 min) [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] | Takahashi: ''VIS'' (30 min) [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=2216|Slides(O)]] |
Line 112: | Line 111: |
Hideyuki Tagoshi (20): ''Status of Data Analysis Subsystem'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] | |
Line 115: | Line 112: |
Chunglee Kim (10): ''Progress Report by KGWG-KAGRA DAS'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] | Hideyuki Tagoshi (15): ''Status of Data Analysis Subsystem'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] Chunglee Kim (15): ''Progress Report by KGWG-KAGRA DAS'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] |
Line 123: | Line 122: |
Osamu Miyakawa: ''Installation plan for DAQ and control system'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] | Osamu Miyakawa: ''Progress and installation schedule for control and DAQ system'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2214|Slides(o)]] |
Line 125: | Line 124: |
Osamu Miyakawa: ''Manufacturing schedule for analog circuits'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=xxx|Slides(X)]] | Osamu Miyakawa: ''Manufacturing plan for analog circuits'' [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2214|Slides(o)]] |
Line 128: | Line 127: |
---- /!\ '''Edit conflict - your version:''' ---- LCGT/Meeting/f2f/2014Febについて、ここに記述してください。 ---- /!\ '''End of edit conflict''' ---- |
Program
Thursday, February 13 (11:00-17:25 + IBR meeting)
- Chair: Kuroda -
Introduction of New members (30 min)
Project Status (45 min)
Lunch Break (12:15-13:30)
- Chair: Kanda -
Collaboration status + Membership (10 + 20 min)
- Chair: Saito -
Installation and Commissioning Schedule (155 min)
Saito: Installation of iKAGRA / Outline (10 min) Slides(O)
Kawamura: Commissioning of iKAGRA (10 min) Slides(O)
Miyoki: TUN + FCL (30 min) Slides(O), Slides(O)
Saito: VAC (25 min) Slides(O)
Coffee Break (15:15-15:35)
- Chair: Ando -
Takahashi: VIS (30 min) Slides(O)
Kawamura: IOO Overvirew (30 min) Slides(O)
Nakano & Somiya: IOO Faraday Isolator (10 min) Slides(O)
Aso: MIF installation and commissioning plan (20 min) Slides(O)
Akutsu: Installation schedule of AOS (20 min) Slides(O)
Meeting of International Board of Representatives
Friday, February 14 (9:30-17:00+ Banquet)
- Chair: Flaminio -
Invited talks (90 minutes)
Jean-Yves Vinet: Features and present status of the Advanced Virgo Antenna (45 minutes) Slides(O)
Yuri Levin: Reciprocity relationships for gravitational-waves interferometers (45 minutes) Slides(O)
Coffee Break (11:00-11:20)
- Chair: Miyakawa -
Progress report 1 (50 min)
Yamamoto: Cryo-payload; suspension structure (30 min) Slides(O)
Chen Dan: Cryo-payload; vibration reduction (20 min) Slides(O)
Lunch Break (12:10-13:40)
- Chair: Uchiyama -
Progress Report 2 (110 min)
Sakakibara: Cryo-payload; cool-down process of a sapphire mirror (20 min) Slides(O)
Tai Hyun Yoon: Frequency-stabilized laser sources for iKAGRA (20 min) Slides(O)
Akito Araya and Akiteru Takamori: Geophysics IF; Observation system and optics configuration (20 min) Slides(O) Slides(O)
Coffee Break (14:40-15:00)
Eiichi Hirose and Kyohei Watanabe: sapphire mirror characteristics (25 min) Slides(O),Slides(O)
Daniel Friedrich: Auxiliary optics, BRT design (25 min) Slides(X)
- Chair: Somiya -
Advanced R&D (60 min)
Kazunori Shibata: Thermal noise in a non-equilibrium state (20 min) Slides(O)
Fumiko Kawazoe: Our 10m Interferometer Prototype (20 min) Slides(O)
Kentaro Somiya: Squeezing for KAGRA (20 min) Slides(O)
Banquet
Saturday, February 15 (9:30-12:00)
- Chair: Hyun-Won Lee -
Subsystem Report-1 (90 minutes)
DetChar: Takahiro Yamamoto, Status of KAGRA detector characterization Slides(X)
Hideyuki Tagoshi (15): Status of Data Analysis Subsystem Slides(X)
Chunglee Kim (15): Progress Report by KGWG-KAGRA DAS Slides(X)
Nobuyuki Kanda : Status of Data Management Subsystem : iKAGRA data system, Data Tier plan Slides(X)
Coffee Break (11:00-11:20)
Subsystem Report-2 (30 min)
Osamu Miyakawa: Progress and installation schedule for control and DAQ system Slides(o)
Osamu Miyakawa: Manufacturing plan for analog circuits Slides(o)
Concluding Remark (10 minutes)