Line 27: Line 27:

== Minutes ==
=== Introduction by Aso ===
 * Why FPC is proposed ?
 * Purpose/Scope of FPC
 * Steps to start FPC
=== Summary of the past upgrade studies by Michimura ===
 * Extensive studies have already been carried out
 * Several options were compared
  * High frequency optimized plan seems better
 * Candidates for short term upgrade (cheap, quick) and longer term upgrade (larger change and more expensive) were discussed
=== Contributed talks by various people ===
 * 100kg sapphire (Hirose)
 * Frequency dependent squeezing (Lee)
 * Newtonian noise measurement (Shimoda)
 * TAMA300 filter cavity (Zhao, Wu)
 * EPR entanglement (Somiya)
 * Engineering management (Aso)
=== Discussion ===
==== What should be included in the white paper ====
  * Scientific motivation
  * Survey of the current technologies
    * Cheap, Expensive
    * Ready, Not ready
  * Limits of the current facility
  * Trade-off studies
  * Two plans
    * Near term upgrade plan
    * Longer term upgrade plan
  * Back up plans
  * R&Ds to be done
    * Budget for R&D
  * Budget estimate
  * Project execution plan
==== Schedule for the white paper ====
    * Work in progress draft to be presented @ KIW in Feb 2019
     * Get feedbacks from Virgo people
    * First draft to be circulated @ April 2019 F2F
    * Final version to be put for approval @ Aug 2019 F2F
==== How to proceed the discussion ? ====
  * Make a skelton of the white paper first
  * Dig deeper into each item with sub-groups
==== Other discussion ====
 * Definitions of short term and longer term upgrades
  * Short term: after O4 (~ in 5 years)
  * Longer term: after O5-6 ? ~ in 10 years
  * This should be discussed in FPC
 * How to get funding should be discussed with relevant people (ICRR, senior people in collaborating countries, etc) in parallel with the white paper writing.
 * Need to keep ICRR in the circle.
 * Review (external/internal) of the white paper may be necessary before submitting to the KSC and EO for approval.
 * The white paper should be updated with changing environment
 * How RDC should select KAGRA project R&Ds before the white paper is finalized ?
  * RDC may be able to make interim approvals
   * These interim KAGRA project R&Ds should be checked against the white paper once it is ready
  * Should be discussed more in the KSC session.

Satellite Meeting on Future Upgrade of KAGRA

Main F2F Page

Date/Time/Venue

Dec. 4th (Tue) 13:30 - 17:30

Large seminar room (3201) in Subaru building (the same as the main F2F meeting)

Zoom connection: https://zoom.us/j/5045179604

Program

Time

Subject and Title

Speaker

File

13:30-13:45

Explanation of the context

Y. Aso

O

13:45-14:45

Report of past activities in Advanced R&D group

Summary of Past Discussions on KAGRA Upgrade

Y. Michimura

(>_<)

14:45-15:00

Break

15:00-16:15

Contributed talks

10 min

R&D of 100kg sapphire crystals

E. Hirose

o

10 min

R&D of frequency dependent squeezer

Ray-Kuang Lee/NTHU

o

10 min

R&D of Newtonian noise measurement

Tomofumi Shimoda (U-Tokyo)

o

20 min

TAMA300 filter cavity exp. status

Yu-hang Zhao and Chien-Ming Wu

o

10min

EPR entanglement

K. Somiya

o

10min

Engineering management for KAGRA upgrade

Y. Aso

O

16:15-16:30

Break

x

16:30-17:30

Discussion

Minutes

Introduction by Aso

  • Why FPC is proposed ?
  • Purpose/Scope of FPC
  • Steps to start FPC

Summary of the past upgrade studies by Michimura

  • Extensive studies have already been carried out
  • Several options were compared
    • High frequency optimized plan seems better
  • Candidates for short term upgrade (cheap, quick) and longer term upgrade (larger change and more expensive) were discussed

Contributed talks by various people

  • 100kg sapphire (Hirose)
  • Frequency dependent squeezing (Lee)
  • Newtonian noise measurement (Shimoda)
  • TAMA300 filter cavity (Zhao, Wu)
  • EPR entanglement (Somiya)
  • Engineering management (Aso)

Discussion

What should be included in the white paper

  • Scientific motivation
  • Survey of the current technologies
    • Cheap, Expensive
    • Ready, Not ready
  • Limits of the current facility
  • Trade-off studies
  • Two plans
    • Near term upgrade plan
    • Longer term upgrade plan
  • Back up plans
  • R&Ds to be done

    • Budget for R&D

  • Budget estimate
  • Project execution plan

Schedule for the white paper

  • Work in progress draft to be presented @ KIW in Feb 2019
    • Get feedbacks from Virgo people
  • First draft to be circulated @ April 2019 F2F
  • Final version to be put for approval @ Aug 2019 F2F

How to proceed the discussion ?

  • Make a skelton of the white paper first
  • Dig deeper into each item with sub-groups

Other discussion

  • Definitions of short term and longer term upgrades
    • Short term: after O4 (~ in 5 years)
    • Longer term: after O5-6 ? ~ in 10 years
    • This should be discussed in FPC
  • How to get funding should be discussed with relevant people (ICRR, senior people in collaborating countries, etc) in parallel with the white paper writing.
  • Need to keep ICRR in the circle.
  • Review (external/internal) of the white paper may be necessary before submitting to the KSC and EO for approval.
  • The white paper should be updated with changing environment
  • How RDC should select KAGRA project R&Ds before the white paper is finalized ?

    • RDC may be able to make interim approvals
      • These interim KAGRA project R&Ds should be checked against the white paper once it is ready

    • Should be discussed more in the KSC session.