Satellite Meeting on Future Upgrade of KAGRA

Main F2F Page

Date/Time/Venue

Dec. 4th (Tue) 13:30 - 17:30

Large seminar room (3201) in Subaru building (the same as the main F2F meeting)

Zoom connection: https://zoom.us/j/5045179604

Program

Time

Subject and Title

Speaker

File

13:30-13:45

Explanation of the context

Y. Aso

O

13:45-14:45

Report of past activities in Advanced R&D group

Summary of Past Discussions on KAGRA Upgrade

Y. Michimura

(>_<)

14:45-15:00

Break

15:00-16:15

Contributed talks

10 min

R&D of 100kg sapphire crystals

E. Hirose

o

10 min

R&D of frequency dependent squeezer

Ray-Kuang Lee/NTHU

o

10 min

R&D of Newtonian noise measurement

Tomofumi Shimoda (U-Tokyo)

o

20 min

TAMA300 filter cavity exp. status

Yu-hang Zhao and Chien-Ming Wu

o

10min

EPR entanglement

K. Somiya

o

10min

Engineering management for KAGRA upgrade

Y. Aso

O

16:15-16:30

Break

x

16:30-17:30

Discussion


Minutes

Introduction by Aso

  • Why FPC is proposed ?
  • Purpose/Scope of FPC
  • Steps to start FPC

Summary of the past upgrade studies by Michimura

  • Extensive studies have already been carried out
  • Several options were compared
    • High frequency optimized plan seems better
  • Candidates for short term upgrade (cheap, quick) and longer term upgrade (larger change and more expensive) were discussed

Contributed talks by various people

  • 100kg sapphire (Hirose)
  • Frequency dependent squeezing (Lee)
  • Newtonian noise measurement (Shimoda)
  • TAMA300 filter cavity (Zhao, Wu)
  • EPR entanglement (Somiya)
  • Engineering management (Aso)

Discussion

What should be included in the white paper

  • Scientific motivation
  • Survey of the current technologies
    • Cheap, Expensive
    • Ready, Not ready
  • Limits of the current facility
  • Trade-off studies
  • Two plans
    • Near term upgrade plan
    • Longer term upgrade plan
  • Back up plans
  • R&Ds to be done

    • Budget for R&D

  • Budget estimate
  • Project execution plan

Schedule for the white paper

  • Work in progress draft to be presented @ KIW in Feb 2019
    • Get feedbacks from Virgo people
  • First draft to be circulated @ April 2019 F2F
  • Final version to be put for approval @ Aug 2019 F2F

How to proceed the discussion ?

  • Make a skelton of the white paper first
  • Dig deeper into each item with sub-groups

Other discussion

  • Definitions of short term and longer term upgrades
    • Short term: after O4 (~ in 5 years)
    • Longer term: after O5-6 ? ~ in 10 years
    • This should be discussed in FPC
  • How to get funding should be discussed with relevant people (ICRR, senior people in collaborating countries, etc) in parallel with the white paper writing.
  • Need to keep ICRR in the circle.
  • Review (external/internal) of the white paper may be necessary before submitting to the KSC and EO for approval.
  • The white paper should be updated with changing environment
  • How RDC should select KAGRA project R&Ds before the white paper is finalized ?

    • RDC may be able to make interim approvals
      • These interim KAGRA project R&Ds should be checked against the white paper once it is ready

    • Should be discussed more in the KSC session.