Satellite Meeting on Future Upgrade of KAGRA
Date/Time/Venue
Dec. 4th (Tue) 13:30 - 17:30
Large seminar room (3201) in Subaru building (the same as the main F2F meeting)
Zoom connection: https://zoom.us/j/5045179604
Program
| Time | Subject and Title | Speaker | File | 
| 13:30-13:45 | Explanation of the context | Y. Aso | |
| 13:45-14:45 | Report of past activities in Advanced R&D group | 
 | |
| 
 | Summary of Past Discussions on KAGRA Upgrade | Y. Michimura | |
| 14:45-15:00 | Break | 
 | |
| 15:00-16:15 | Contributed talks | 
 | |
| 10 min | R&D of 100kg sapphire crystals | E. Hirose | |
| 10 min | R&D of frequency dependent squeezer | Ray-Kuang Lee/NTHU | |
| 10 min | R&D of Newtonian noise measurement | Tomofumi Shimoda (U-Tokyo) | |
| 20 min | TAMA300 filter cavity exp. status | Yu-hang Zhao and Chien-Ming Wu | |
| 10min | EPR entanglement | K. Somiya | |
| 10min | Engineering management for KAGRA upgrade | Y. Aso | |
| 16:15-16:30 | Break | 
 | |
| 16:30-17:30 | Discussion | 
 | |
| 
 | 
 | 
 | 
 | 
Minutes
Introduction by Aso
- Why FPC is proposed ?
- Purpose/Scope of FPC
- Steps to start FPC
Summary of the past upgrade studies by Michimura
- Extensive studies have already been carried out
- Several options were compared - High frequency optimized plan seems better
 
- Candidates for short term upgrade (cheap, quick) and longer term upgrade (larger change and more expensive) were discussed
Contributed talks by various people
- 100kg sapphire (Hirose)
- Frequency dependent squeezing (Lee)
- Newtonian noise measurement (Shimoda)
- TAMA300 filter cavity (Zhao, Wu)
- EPR entanglement (Somiya)
- Engineering management (Aso)
Discussion
What should be included in the white paper
- Scientific motivation
- Survey of the current technologies - Cheap, Expensive
- Ready, Not ready
 
- Limits of the current facility
- Trade-off studies
- Two plans - Near term upgrade plan
- Longer term upgrade plan
 
- Back up plans
- R&Ds to be done - Budget for R&D 
 
- Budget estimate
- Project execution plan
Schedule for the white paper
- Work in progress draft to be presented @ KIW in Feb 2019 - Get feedbacks from Virgo people
 
- First draft to be circulated @ April 2019 F2F
- Final version to be put for approval @ Aug 2019 F2F
How to proceed the discussion ?
- Make a skelton of the white paper first
- Dig deeper into each item with sub-groups
Other discussion
- Definitions of short term and longer term upgrades - Short term: after O4 (~ in 5 years)
- Longer term: after O5-6 ? ~ in 10 years
- This should be discussed in FPC
 
- How to get funding should be discussed with relevant people (ICRR, senior people in collaborating countries, etc) in parallel with the white paper writing.
- Need to keep ICRR in the circle.
- Review (external/internal) of the white paper may be necessary before submitting to the KSC and EO for approval.
- The white paper should be updated with changing environment
- How RDC should select KAGRA project R&Ds before the white paper is finalized ? - RDC may be able to make interim approvals - These interim KAGRA project R&Ds should be checked against the white paper once it is ready 
 
- Should be discussed more in the KSC session.
 
- RDC may be able to make interim approvals