Differences between revisions 9 and 19 (spanning 10 versions)
Revision 9 as of 2012-02-10 14:01:18
Size: 1618
Comment:
Revision 19 as of 2012-09-16 20:36:13
Size: 2205
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
'''''Related subgroups:''''' VAC, MIF(initial Alignment, Instrument Control), DGS '''''Related subgroups:''''' VAC, MIF(Initial Alignment, Instrument Control), DGS
Line 4: Line 4:
'''[[../|..Up]]''' '''[[KAGRA/Subgroups/AOS| back to AOS top]]'''
Line 22: Line 22:
Each unit of target system consists of an liner feed-through and a target circle with a center hole,
where a part of beam can pass through even when the target is tuned on.
The linear feed-through is a manipulator, and it is driven by pressure air then.
Each unit of target system consists of an liner feed-through (as a manipulator) and a circle plate (as a target head) with a center hole,
where a part of laser beam can pass through even when the target is tuned on.
The linear feed-through is driven by pressure air then.
Line 26: Line 26:
For KAGRA, the motion drive source will be a motor(?). For KAGRA, the motion drive source will be an electric motor(?).
Line 41: Line 41:
TBD  * It should be remotely turned on/off.
 * It should be viewable (not necessarily visual) when the target head is illuminated by IR/green lasers. Note that these laser powers for initial alignment would be somewhat smaller.
Line 53: Line 55:
== Installation plan ==
For this subsystem, the complete installation means that it is installed '''''and verified'''''.
The targets will be installed along with vacuum chambers.
This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.

Automatic Target System

Related subgroups: VAC, MIF(Initial Alignment, Instrument Control), DGS


back to AOS top

Scope

The scope of Automatic Target System is to provide targets on the way of a beam line, and to be used for the alignment of the beam line in the interferometer. This system helps commissioning phase, and will be turned off during the observation mode.

For example, each arm cavity should have this system. Several targets will be located in the arm tube, and have an accessible human interface for operators to easily and remotely turn them on/off from the center room.

Applicable Documents

None.

General Description

This kind of system has been already developed and practically used in TAMA300. Each unit of target system consists of an liner feed-through (as a manipulator) and a circle plate (as a target head) with a center hole, where a part of laser beam can pass through even when the target is tuned on. The linear feed-through is driven by pressure air then.

For KAGRA, the motion drive source will be an electric motor(?).

Functions

TBD

Naming Conventions

TBD

Locations

  • X-arm tube
  • Y-arm tube

For each arm, preliminary locations of targets is shown in JGW-T1200816

Requirements

  • It should be remotely turned on/off.
  • It should be viewable (not necessarily visual) when the target head is illuminated by IR/green lasers. Note that these laser powers for initial alignment would be somewhat smaller.

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

Installation plan

For this subsystem, the complete installation means that it is installed and verified. The targets will be installed along with vacuum chambers. This system is indispensable for the initial alignment of beam lines, so at least it should be installed and tested by 201x.