Differences between revisions 3 and 11 (spanning 8 versions)
Revision 3 as of 2018-01-23 21:26:06
Size: 451
Comment:
Revision 11 as of 2018-01-24 20:30:25
Size: 1594
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 20180123 memo =
== At Kamioka ==
= 20180123 =
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4018]]
== Today's activity ==
=== At Kamioka ===
Line 4: Line 6:
 * Brought two hex wrench sets into the IYC chamber.  * Brought a SUS table into the IYC clean booth; covered with aluminum foil.
 * Brought a metal rack to stock parts.
 * Brought two oplev viewport windows.
 * Brought a set of oplev setup.
 * Brought two hex wrench sets.
Line 6: Line 12:
 * Wanted cutters and scissors!!  * Wanted '''''cutters and scissors!!'''''
Line 8: Line 14:
 * Wanted/needed a fiber cleaner, which would be now at the Yend; '''''need to get back.'''''
 * Wanted
 * Wanted/needed a fiber cleaner to connect oplev source parts; '''''need to get back''''' from Yend.
 * Wanted M6 screw set.
Line 11: Line 17:
 * Checked the current status of the inside of the IYC chamber; '''''need to confirm''''' what are the scratch lines made by the measurement by the KEK team last week.

=== At Mitaka ===
 * Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.)

== Tomorrow's plan ==
 * Pick up a QPD board for the oplev!
 * Accept the delivered WAB suspension.
 * Check the temperature of the WAB suspension; when we don't feel bedewing, let's unpack it.
 * Check small parts which Simon will bring with him.
 * Prepare some measurement setup
  * Check tilt of the basement optical table in the IYC chamber.
  * Check heights of several points; need to have a laser leveler and a horizontal ruler with a tiltmeter.

20180123

http://klog.icrr.u-tokyo.ac.jp/osl/?r=4018

Today's activity

At Kamioka

Workers: Akutsu, Miyo, Hasegawa

  • Brought a SUS table into the IYC clean booth; covered with aluminum foil.
  • Brought a metal rack to stock parts.
  • Brought two oplev viewport windows.
  • Brought a set of oplev setup.
  • Brought two hex wrench sets.
  • Brought two wrenches for anchor bolts for oplev pylons.
  • Wanted cutters and scissors!!

  • Wanted a clock to know the time easily.
  • Wanted/needed a fiber cleaner to connect oplev source parts; need to get back from Yend.

  • Wanted M6 screw set.
  • Found water springs from anchor bolts for oplev pylons; need cares!

  • Checked the current status of the inside of the IYC chamber; need to confirm what are the scratch lines made by the measurement by the KEK team last week.

At Mitaka

  • Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.)

Tomorrow's plan

  • Pick up a QPD board for the oplev!
  • Accept the delivered WAB suspension.
  • Check the temperature of the WAB suspension; when we don't feel bedewing, let's unpack it.
  • Check small parts which Simon will bring with him.
  • Prepare some measurement setup
    • Check tilt of the basement optical table in the IYC chamber.
    • Check heights of several points; need to have a laser leveler and a horizontal ruler with a tiltmeter.