Size: 461
Comment:
|
← Revision 11 as of 2018-01-24 20:30:25 ⇥
Size: 1594
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= 20180123 memo = == At Kamioka == |
= 20180123 = [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4018]] == Today's activity == === At Kamioka === |
Line 4: | Line 6: |
* Brought two hex wrench sets into the IYC chamber. | * Brought a SUS table into the IYC clean booth; covered with aluminum foil. * Brought a metal rack to stock parts. * Brought two oplev viewport windows. * Brought a set of oplev setup. * Brought two hex wrench sets. |
Line 6: | Line 12: |
* '''''Wanted cutters and scissors!!''''' | * Wanted '''''cutters and scissors!!''''' |
Line 8: | Line 14: |
* Wanted/needed a fiber cleaner, which would be now at the Yend; '''''need to get back.''''' * Wanted |
* Wanted/needed a fiber cleaner to connect oplev source parts; '''''need to get back''''' from Yend. * Wanted M6 screw set. |
Line 11: | Line 17: |
* Checked the current status of the inside of the IYC chamber; '''''need to confirm''''' what are the scratch lines made by the measurement by the KEK team last week. === At Mitaka === * Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.) == Tomorrow's plan == * Pick up a QPD board for the oplev! * Accept the delivered WAB suspension. * Check the temperature of the WAB suspension; when we don't feel bedewing, let's unpack it. * Check small parts which Simon will bring with him. * Prepare some measurement setup * Check tilt of the basement optical table in the IYC chamber. * Check heights of several points; need to have a laser leveler and a horizontal ruler with a tiltmeter. |
20180123
http://klog.icrr.u-tokyo.ac.jp/osl/?r=4018
Today's activity
At Kamioka
Workers: Akutsu, Miyo, Hasegawa
- Brought a SUS table into the IYC clean booth; covered with aluminum foil.
- Brought a metal rack to stock parts.
- Brought two oplev viewport windows.
- Brought a set of oplev setup.
- Brought two hex wrench sets.
- Brought two wrenches for anchor bolts for oplev pylons.
Wanted cutters and scissors!!
- Wanted a clock to know the time easily.
Wanted/needed a fiber cleaner to connect oplev source parts; need to get back from Yend.
- Wanted M6 screw set.
Found water springs from anchor bolts for oplev pylons; need cares!
Checked the current status of the inside of the IYC chamber; need to confirm what are the scratch lines made by the measurement by the KEK team last week.
At Mitaka
- Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.)
Tomorrow's plan
- Pick up a QPD board for the oplev!
- Accept the delivered WAB suspension.
- Check the temperature of the WAB suspension; when we don't feel bedewing, let's unpack it.
- Check small parts which Simon will bring with him.
- Prepare some measurement setup
- Check tilt of the basement optical table in the IYC chamber.
- Check heights of several points; need to have a laser leveler and a horizontal ruler with a tiltmeter.