= 20180123 memo = == At Kamioka == |
= 20180123 = == Memos == === At Kamioka === |
Line 4: | Line 5: |
* Brought two hex wrench sets into the IYC chamber. | * Brought a SUS table into the IYC clean booth; covered with aluminum foil. * Brought a metal rack to stock parts. * Brought two oplev viewport windows. * Brought a set of oplev setup. * Brought two hex wrench sets. |
Line 11: | Line 16: |
* Checked the current status of the inside of the IYC chamber; '''''need to confirm''''' what are the scratch lines made by the measurement by the KEK team last week. | |
Line 12: | Line 18: |
== At Mitaka == | === At Mitaka === |
20180123
Memos
At Kamioka
Workers: Akutsu, Miyo, Hasegawa
- Brought a SUS table into the IYC clean booth; covered with aluminum foil.
- Brought a metal rack to stock parts.
- Brought two oplev viewport windows.
- Brought a set of oplev setup.
- Brought two hex wrench sets.
- Brought two wrenches for anchor bolts for oplev pylons.
Wanted cutters and scissors!!
- Wanted a clock to know the time easily.
Wanted/needed a fiber cleaner, which would be now at the Yend; need to get back.
- Wanted M6 screw set.
Found water springs from anchor bolts for oplev pylons; need cares!
Checked the current status of the inside of the IYC chamber; need to confirm what are the scratch lines made by the measurement by the KEK team last week.
At Mitaka
- Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.)