 * Wanted/needed a fiber cleaner, which would be now at the Yend; '''''need to get back.'''''  * Wanted/needed a fiber cleaner to connect oplev source parts; '''''need to get back''''' from Yend.

20180123

Memos

At Kamioka

Workers: Akutsu, Miyo, Hasegawa

  • Brought a SUS table into the IYC clean booth; covered with aluminum foil.
  • Brought a metal rack to stock parts.
  • Brought two oplev viewport windows.
  • Brought a set of oplev setup.
  • Brought two hex wrench sets.
  • Brought two wrenches for anchor bolts for oplev pylons.
  • Wanted cutters and scissors!!

  • Wanted a clock to know the time easily.
  • Wanted/needed a fiber cleaner to connect oplev source parts; need to get back from Yend.

  • Wanted M6 screw set.
  • Found water springs from anchor bolts for oplev pylons; need cares!

  • Checked the current status of the inside of the IYC chamber; need to confirm what are the scratch lines made by the measurement by the KEK team last week.

At Mitaka

  • Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.)