Differences between revisions 1 and 2
Revision 1 as of 2018-03-06 22:52:57
Size: 1314
Comment:
Revision 2 as of 2018-03-06 22:54:24
Size: 1426
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Injected coil actuation in the several current amounts (actually voltage setups); '''''reported later.'''''

20180306

Today's activities

Workers: Miyo, Akutsu

  • Connected an easy heat link from the top to the suspension structure; see here.

  • Completed the setup.
  • Injected coil actuation in the several current amounts (actually voltage setups); reported later.

  • [Ongoing] Need cares of water springs from anchor bolts for oplev pylons.

  • [Ongoing] Need to confirm what are the scratch lines made by the measurement by the KEK team last week.

Next plan

  • Complete the PS calibration.
  • Complete the calibration of the oplev; the arm length was reported by Simon, so....
  • Complete the signal matrix.
  • Check the balance of the suspended WAB with some wires and sensors are attached.
  • Check how the damping would be now after the replacement of the damping magnets.
  • Check the reproducibility of the alignment of the suspension among several modes.
  • Check heights of several points.
  • Take care of water spring??

Wanted!

  • Two burndy connectors, vacuum compatible.
  • Stages outside the chamber to ease wiping our legs.

  • Good rail(?) to move the WAB suspension in the cryostat in the main beam direction.

  • Chain block? to support the load in the chamber.

  • A clock to know the time easily.
  • M6 screw set.

LCGT/subgroup/AOS/WideAngleBuffle/2018-03-06 (last edited 2018-03-06 22:54:24 by TomotadaAkutsu)