Differences between revisions 2 and 3
Revision 2 as of 2018-03-19 16:59:50
Size: 1119
Comment:
Revision 3 as of 2018-03-19 17:00:08
Size: 1131
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * Cabled from a gige camera Kokeyama-san prepared to 100 m away by Miyo-kun and some students from Univ. of Toyama (I'm sorry but please '''''list''''' here)  * Cabled from a gige camera, which Kokeyama-san has prepared, to 100 m away by Miyo-kun and some students from Univ. of Toyama (I'm sorry but please '''''list''''' here)

20180315

Today's activities

  • Yokozawa-san changed the rate of the illumination lighting for the TCam (see here). Let'see.

  • Cabled from a gige camera, which Kokeyama-san has prepared, to 100 m away by Miyo-kun and some students from Univ. of Toyama (I'm sorry but please list here)

  • [Ongoing] Need cares of water springs from anchor bolts for oplev pylons.

  • [Ongoing] Need to confirm what are the scratch lines made by the measurement by the KEK team last week.

Next plan

  • Check the balance of the suspended WAB with some wires and sensors are attached.
  • Check how the damping would be now after the replacement of the damping magnets.
  • Check the reproducibility of the alignment of the suspension among several modes.
  • Check heights of several points.
  • Take care of water spring??

Wanted!

  • Good rail(?) to move the WAB suspension in the cryostat in the main beam direction.

  • Chain block? to support the load in the chamber.

LCGT/subgroup/AOS/WideAngleBuffle/2018-03-15 (last edited 2018-04-02 19:55:41 by TomotadaAkutsu)