Differences between revisions 11 and 13 (spanning 2 versions)
Revision 11 as of 2018-01-23 09:56:29
Size: 1368
Editor: KousekiMiyo
Comment:
Revision 13 as of 2018-01-23 22:09:23
Size: 2258
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
== a ==
<<MonthCalendar>>

== Task list ==
 * Place the WAB suspension.
 * Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
  * What....?
 * Don't forget to replace the damping magnets to SmCo ones; those will be delivered on '''''Jan 26'''''.
  * What is the requirement to say the damping is sufficient...?
 * Connect electric cables (with checking) in the IYC chamber.
  * 3 photosensors; in each photosensor head, two PDs should be connected parallel.
  * 2 heaters; should be connected parallel??
  * 1 coil for actuation.
  * 6 thermometers with phospher bronze cables (will be delivered in this week...?)
 * Connect 4 heat links.
 * Check oplev signals.
 * Connect cables the outside as well.
 * Make a realtime model to monitor.
 * Take interface with Tcam.
 * Make a plan to do leak check before cooling down.

Wide Angle Baffle

<< <  2024 / 11 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

Task list

  • Place the WAB suspension.
  • Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
    • What....?
  • Don't forget to replace the damping magnets to SmCo ones; those will be delivered on Jan 26.

    • What is the requirement to say the damping is sufficient...?
  • Connect electric cables (with checking) in the IYC chamber.
    • 3 photosensors; in each photosensor head, two PDs should be connected parallel.
    • 2 heaters; should be connected parallel??
    • 1 coil for actuation.
    • 6 thermometers with phospher bronze cables (will be delivered in this week...?)
  • Connect 4 heat links.
  • Check oplev signals.
  • Connect cables the outside as well.
  • Make a realtime model to monitor.
  • Take interface with Tcam.
  • Make a plan to do leak check before cooling down.

b

c

DAQ

Real-time computer: k1???

Slot

Item

Assigned to

S/N

42

<blank>

41

<blank>

40

<blank>

39

<blank>

38

<blank>

37

<blank>

36

<blank>

35

<blank>

34

<blank>

33

<blank>

32

<blank>

31

<blank>

30

<blank>

29

<blank>

28

<blank>

27

<blank>

26

<blank>

25

<blank>

24

<blank>

23

<blank>

22

<blank>

21

<blank>

20

<blank>

19

<blank>

18

<blank>

17

<blank>

16

<blank>

15

<blank>

14

<blank>

13

<blank>

12

AI Chassis

DAC0

SN???

11

AA Chassis

ADC0

SN???

10

<blank>

9

I/O Chassis

SN???

8

<blank>

7

<blank>

6

<blank>

5

<blank>

4

<blank>

3

<blank>

2

<blank>

1

<blank>

0

<blank>

LCGT/subgroup/AOS/WideAngleBuffle (last edited 2018-07-18 15:17:37 by TomotadaAkutsu)