== Task list ==
 * Place the WAB suspension.
 * Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
  * What....?
 * Don't forget to replace the damping magnets to SmCo ones; those will be delivered on '''''Jan 26'''''.
  * What is the requirement to say the damping is sufficient...?
 * Connect electric cables (with checking) in the IYC chamber.
  * 3 photosensors; in each photosensor head, two PDs should be connected parallel. '''''Need to calibrate the response of each sensor head...'''''
  * 2 heaters; should be connected parallel??
  * 1 coil for actuation.
  * 6 thermometers with (extended?) phospher bronze cables; the extended double twisted pare cables will be delivered on '''''Jan 26'''''
 * Connect 4 heat links.
 * Check oplev signals.
 * Connect cables the outside as well.
 * Make a realtime model to monitor.
 * Take interface with Tcam.
 * Make a plan to do leak check before cooling down.
Line 5: Line 25:
=== Rack ===
 * Real-time computer: k1ey1
=== DAQ ===
==== ====
Real-time computer: k1???
Line 8: Line 29:
||42|| Stepper Motor Driver || IP + F0 yaw|| [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6039|S1706039]] ||
||41|| Stepper Motor Driver || GAS Fishing Rod || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6043|S1706043]] ||
||40|| Binary In/Out Converter || Switch for stepper motor drivers ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5898|S1605898]]||
||39|| Low Power Coil Driver || TM act ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5504|S1605504]]||
||38|| Low Power Coil Driver For Cryo-Payload || IM DAMPING COIL ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5501|S1605501]]||
||37|| Low Power Coil Driver For Cryo-Payload || IM act[H1,H2,H3,V3] ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4825|S1604825]]||
||36|| Low Power Coil Driver For Cryo-Payload || MN act[V1,V2],IM act[V1,V2]||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4762|S1604762]]||
||35|| Low Power Coil Driver For Cryo-Payload || MN act[H1,H2,H3,V3] ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4946|S1604946]]||
||34||''<blank>''|| || ||
||33|| High Power Coil Driver || BFH act ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6236|S1706236]]||
||32|| High Power Coil Driver || BFV act ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6235|S1706235]]||
||31||''<blank>'' || || ||
||30|| High Power Coil Driver || IP + F0 || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6234|S1706234]] ||
||29|| High Power Coil Driver || GAS (F1-BF) || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5494|S1605494]] ||
||28||<|4> NIM Rack - ACC Driver||<|4>IP ACC||<|4> ||
||27||
||26||
||25||
||42||''<blank>''|| || ||
||41||''<blank>''|| || ||
||40||''<blank>''|| || ||
||39||''<blank>''|| || ||
||38||''<blank>''|| || ||
||37||''<blank>''|| || ||
||36||''<blank>''|| || ||
||35||''<blank>''|| || ||
||34||''<blank>''|| || ||
||33||''<blank>''|| || ||
||32||''<blank>''|| || ||
||31||''<blank>''|| || ||
||30||''<blank>''|| || ||
||29||''<blank>''|| || ||
||28||''<blank>''|| || ||
||27||''<blank>''|| || ||
||26||''<blank>''|| || ||
||25||''<blank>''|| || ||
Line 30: Line 51:
||20|| BNC => Dsub Converter || IP ACC || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5842|S1605842]] ||
||19||Whitening Chassis with DC Power || TM OPLEV || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5076|S1605076]] ||
||18|| LVDT Driver || BF V, BF H ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3046|S1403046]]||
||17|| LVDT-ACT Combiner || BF V, BF H ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6493|S1706493]]||
||16|| LVDT Driver || IP H, F0-BF GAS ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3048|S1403048]]||
||15|| LVDT-ACT Distributor || IP H, F0-BF GAS ||[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3681|S1503681]]||
||14|| AI Chassis || DAC_1 || SN015 ||
||13|| AA Chassis || ADC1 || SN021 ||
||12|| AI Chassis || DAC_0 || SN014 ||
||11|| AA Chassis || ADC0 || SN020 ||
||20||''<blank>''|| || ||
||19||''<blank>''|| || ||
||18||''<blank>''|| || ||
||17||''<blank>''|| || ||
||16||''<blank>''|| || ||
||15||''<blank>''|| || ||
||14||''<blank>''|| || ||
||13||''<blank>''|| || ||
||12|| AI Chassis || DAC0 || SN??? ||
||11|| AA Chassis || ADC0 || SN??? ||
Line 41: Line 62:
|| 9||<|4>I/O Chassis||<|4> ||<|4> SN016 ||
|| 8||
|| 7||
|| 6||
|| 9||<|4>I/O Chassis||<|4> ||<|4> SN??? ||
|| 8||''<blank>''|| || ||
|| 7||''<blank>''|| || ||
|| 6||''<blank>''|| || ||

Wide Angle Baffle

<< <  2024 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

Task list

  • Place the WAB suspension.
  • Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
    • What....?
  • Don't forget to replace the damping magnets to SmCo ones; those will be delivered on Jan 26.

    • What is the requirement to say the damping is sufficient...?
  • Connect electric cables (with checking) in the IYC chamber.
    • 3 photosensors; in each photosensor head, two PDs should be connected parallel. Need to calibrate the response of each sensor head...

    • 2 heaters; should be connected parallel??
    • 1 coil for actuation.
    • 6 thermometers with (extended?) phospher bronze cables; the extended double twisted pare cables will be delivered on Jan 26

  • Connect 4 heat links.
  • Check oplev signals.
  • Connect cables the outside as well.
  • Make a realtime model to monitor.
  • Take interface with Tcam.
  • Make a plan to do leak check before cooling down.

b

c

DAQ

Real-time computer: k1???

Slot

Item

Assigned to

S/N

42

<blank>

41

<blank>

40

<blank>

39

<blank>

38

<blank>

37

<blank>

36

<blank>

35

<blank>

34

<blank>

33

<blank>

32

<blank>

31

<blank>

30

<blank>

29

<blank>

28

<blank>

27

<blank>

26

<blank>

25

<blank>

24

<blank>

23

<blank>

22

<blank>

21

<blank>

20

<blank>

19

<blank>

18

<blank>

17

<blank>

16

<blank>

15

<blank>

14

<blank>

13

<blank>

12

AI Chassis

DAC0

SN???

11

AA Chassis

ADC0

SN???

10

<blank>

9

I/O Chassis

SN???

8

<blank>

7

<blank>

6

<blank>

5

<blank>

4

<blank>

3

<blank>

2

<blank>

1

<blank>

0

<blank>

LCGT/subgroup/AOS/WideAngleBuffle (last edited 2018-07-18 15:17:37 by TomotadaAkutsu)