Size: 1335
Comment:
|
Size: 2491
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
== a == | <<MonthCalendar>> == Task list == Note: some of the tasks can be done in parallel. * Place/install the WAB suspension. * Measure several relative dimensions to get useful information for the future commissioning; concretely speaking: * What....? * Test the '''''save mode''''' of the WAB suspension. * Don't forget to replace the damping magnets to SmCo ones; those will be delivered on '''''Jan 26'''''. * What is the requirement to say the damping is sufficient...? * Connect electric cables (with checking) in the IYC chamber. * 3 photosensors; in each photosensor head, two PDs should be connected parallel. '''''Need to calibrate the response of each sensor head...''''' * 2 heaters; should be connected parallel?? * 1 coil for actuation. * 6 thermometers with (extended?) phospher bronze cables; the extended double twisted pare cables will be delivered on '''''Jan 26''''' * Connect 4 heat links. * Check oplev signals. * Connect cables the outside as well. * Make a realtime model to monitor. * Take interface with Tcam. * Make a plan to do leak check before cooling down. |
Line 5: | Line 27: |
=== Rack === * Real-time computer: k1ey1 |
=== DAQ === ==== ==== Real-time computer: k1??? |
Line 9: | Line 32: |
||41||''<blank>''|| || || ||40||''<blank>''|| || || ||39||''<blank>''|| || || ||38||''<blank>''|| || || ||37||''<blank>''|| || || ||36||''<blank>''|| || || |
||41||''<blank>''|| || || ||40||''<blank>''|| || || ||39||''<blank>''|| || || ||38||''<blank>''|| || || ||37||''<blank>''|| || || ||36||''<blank>''|| || || |
Line 36: | Line 59: |
||14|| AI Chassis || DAC_1 || SN015 || ||13|| AA Chassis || ADC1 || SN021 || ||12|| AI Chassis || DAC_0 || SN014 || ||11|| AA Chassis || ADC0 || SN020 || |
||14||''<blank>''|| || || ||13||''<blank>''|| || || ||12|| AI Chassis || DAC0 || SN??? || ||11|| AA Chassis || ADC0 || SN??? || |
Line 41: | Line 64: |
|| 9||<|4>I/O Chassis||<|4> ||<|4> SN016 || || 8|| || 7|| || 6|| |
|| 9||<|4>I/O Chassis||<|4> ||<|4> SN??? || || 8||''<blank>''|| || || || 7||''<blank>''|| || || || 6||''<blank>''|| || || |
Wide Angle Baffle
<< < 2025 / 5 > >> | ||||||
---|---|---|---|---|---|---|
Mon | Tue | Wed | Thu | Fri | Sat | Sun |
1 | 2 | 3 | 4 | |||
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 |
Task list
Note: some of the tasks can be done in parallel.
- Place/install the WAB suspension.
- Measure several relative dimensions to get useful information for the future commissioning; concretely speaking:
- What....?
Test the save mode of the WAB suspension.
Don't forget to replace the damping magnets to SmCo ones; those will be delivered on Jan 26.
- What is the requirement to say the damping is sufficient...?
- Connect electric cables (with checking) in the IYC chamber.
3 photosensors; in each photosensor head, two PDs should be connected parallel. Need to calibrate the response of each sensor head...
- 2 heaters; should be connected parallel??
- 1 coil for actuation.
6 thermometers with (extended?) phospher bronze cables; the extended double twisted pare cables will be delivered on Jan 26
- Connect 4 heat links.
- Check oplev signals.
- Connect cables the outside as well.
- Make a realtime model to monitor.
- Take interface with Tcam.
- Make a plan to do leak check before cooling down.
b
c
DAQ
Real-time computer: k1???
Slot |
Item |
Assigned to |
S/N |
42 |
<blank> |
|
|
41 |
<blank> |
|
|
40 |
<blank> |
|
|
39 |
<blank> |
|
|
38 |
<blank> |
|
|
37 |
<blank> |
|
|
36 |
<blank> |
|
|
35 |
<blank> |
|
|
34 |
<blank> |
|
|
33 |
<blank> |
|
|
32 |
<blank> |
|
|
31 |
<blank> |
|
|
30 |
<blank> |
|
|
29 |
<blank> |
|
|
28 |
<blank> |
|
|
27 |
<blank> |
|
|
26 |
<blank> |
|
|
25 |
<blank> |
|
|
24 |
<blank> |
|
|
23 |
<blank> |
|
|
22 |
<blank> |
|
|
21 |
<blank> |
|
|
20 |
<blank> |
|
|
19 |
<blank> |
|
|
18 |
<blank> |
|
|
17 |
<blank> |
|
|
16 |
<blank> |
|
|
15 |
<blank> |
|
|
14 |
<blank> |
|
|
13 |
<blank> |
|
|
12 |
AI Chassis |
DAC0 |
SN??? |
11 |
AA Chassis |
ADC0 |
SN??? |
10 |
<blank> |
|
|
9 |
I/O Chassis |
|
SN??? |
8 |
<blank> |
|
|
7 |
<blank> |
|
|
6 |
<blank> |
|
|
5 |
<blank> |
|
|
4 |
<blank> |
|
|
3 |
<blank> |
|
|
2 |
<blank> |
|
|
1 |
<blank> |
|
|
0 |
<blank> |
|
|