Size: 1848
Comment:
|
Size: 1946
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
* SRC Folding, Yes or No ? * Decide on the Arm cavity g-factor * Dynamic range * f1 frequency. Is 11.25MHz really OK ? * ASC status [[attachment:MIFmeeting20110209michimura.pdf]] |
* SRC Folding, Yes or No ? (Nishida, Chen) * Decide on the Arm cavity g-factor (Aso) * Dynamic range (Miyakawa) * AM-PM or PM-PM, detune method, MZ (Somiya) * f1 frequency. Is 11.25MHz really OK ? (Aso) * ASC status [[attachment:MIFmeeting20110209michimura.pdf]] (Michimura) |
Meetings
MIF Meeting 2011 Feb.
2011/2/9 13:00 -
EVO and 本郷604号室
Agenda
Edit conflict - other version:
- SRC Folding, Yes or No ? (Nishida, Chen)
- Decide on the Arm cavity g-factor (Aso)
- Dynamic range (Miyakawa)
- AM-PM or PM-PM, detune method, MZ (Somiya)
- f1 frequency. Is 11.25MHz really OK ? (Aso)
ASC status MIFmeeting20110209michimura.pdf (Michimura)
- Green lock design
- Mirror specs
Edit conflict - your version:
- SRC Folding, Yes or No ? (Nishida, Chen)
- Decide on the Arm cavity g-factor (Aso)
- AM-PM or PM-PM, detuning method, MZ (Somiya)
- Dynamic range (Miyakawa)
- f1 frequency. Is 11.25MHz really OK ? (Aso)
- ASC status (Michimura)
- Green lock design
- Mirror specs
End of edit conflict
- Task assignment
EVO Information
Title: LCGT MIF Meeting Description: Community: Universe
Meeting Access Information: - Meeting URL
- Phone Bridge
- ID: 288 2570
Japan Standard Time (+0900)
- Start 2011-02-09 12:30 End 2011-02-09 18:00
Spatial Mode Telecon
2010/8/5 13:00 - 本郷414号室 & EVO
- 麻生資料
タスクリスト、スケジュール、予算 IFODesignPlan.pdf
The first telecon
- 2009/5/14 13:00-15:00 Skype会議
- 国立天文台 第三会議室 (担当: 新井)
- 東大新領域(柏) 場所TBD (担当: 大前)
- 神岡 (宮川)
- 坪野研 (高橋)
- 川村
- NICT長野
- Caltech 山本
会議資料(麻生) Meeting-2009-05-14.pdf
会議資料(佐藤) lcgt_isc_20090514_sato.pdf