Size: 572
Comment:
|
Size: 2157
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
---- | |
Line 6: | Line 7: |
=== End Product === '''A document which describes the sensing and control scheme for the LCGT and the discusses how we arrived at the decision.''' === About the ISC group and this Wiki page === ISC (Interferometer Sensing and Control) working group is a working group dedicated to the development of a sensing and control scheme for the LCGT. This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this page itself is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion. === Approach === The basic approach of this working group will be to build a detailed model of the interferometer and use this model to investigate and test proposed sensing-control schemes. The core IFO model will simulate the interferometric part of the system (i.e. behavior of the electric fields). We will add various external elements, such as suspension model, feedback effect, thermal noise etc, into the core model to make the model more realistic. Our objective is to build a model which can produce a realistic noise budget for the LCGT and identify potential problems using the model before the construction of LCGT. === Modeling Efforts === * bKAGRA (BRSE) power budget |
|
Line 7: | Line 23: |
=== Organization === ==== Members ==== We will create a mailing list for this working group soon. People who subscribe to this ML will be considered as members of the working group. |
[[/Meetings|Meetings]] ---- [[/Organization|Organization]] |
Line 11: | Line 27: |
==== Communication ==== ===== Mailing List ===== The main communication channel of this working group will be email through the mailing list. |
[[/TimeFrame|Time frame]] [[/ICD|Interface Control Document]] [[/IFOParameters|Interferometer Parameters]] [[/Issues|Current Issues]] [[/TaskList|Task list]] [[/Tools|Tools]] [[/Repository|Svn repository]] [[/Review|Review Policy]] [[/Terminology|Terminology and Acronyms]] |
Line 15: | Line 46: |
=== Task List === | [[/CoreDocuments|Core Documents]] [[/PastDiscuss|Past Discussions]] [[/TAMA_RSE|TAMA RSE detailed design]] |
Interferometer Sensing and Control
Objective of the working group
To Establish a Robust and Low-Noise Sensing-Control Scheme for the LCGT Interferometer.
End Product
A document which describes the sensing and control scheme for the LCGT and the discusses how we arrived at the decision.
About the ISC group and this Wiki page
ISC (Interferometer Sensing and Control) working group is a working group dedicated to the development of a sensing and control scheme for the LCGT. This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this page itself is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion.
Approach
The basic approach of this working group will be to build a detailed model of the interferometer and use this model to investigate and test proposed sensing-control schemes. The core IFO model will simulate the interferometric part of the system (i.e. behavior of the electric fields). We will add various external elements, such as suspension model, feedback effect, thermal noise etc, into the core model to make the model more realistic. Our objective is to build a model which can produce a realistic noise budget for the LCGT and identify potential problems using the model before the construction of LCGT.
Modeling Efforts
- bKAGRA (BRSE) power budget