Differences between revisions 5 and 6
Revision 5 as of 2009-05-04 16:23:11
Size: 788
Editor: YoichiAso
Comment:
Revision 6 as of 2009-05-04 16:36:57
Size: 906
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:

Line 6: Line 8:

=== About the ISC group and this Wiki page ===
ISC (Interferometer Sensing and Control) working group is a working group dedicated to the development of a sensing and control scheme for the LCGT.
This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion.
 
Line 7: Line 14:
[[LCGT/subgroup/ifo/ISC/Organization|Organizatoin]] [[/Organization|Organization]]
Line 9: Line 16:
=== Organization ===
==== Members ====
We will create a mailing list for this working group soon. People who subscribe to this ML will be considered as members of the working group.
[[/TimeFrame|Time frame]]
Line 13: Line 18:
==== Communication ====
===== Mailing List =====
The main communication channel of this working group will be email through the mailing list.

===== Telecon =====
On-line conferences will be held biweekly to summarize the discussions in the past weeks and determine the plans for the next weeks.
----
=== Task List ===
[[/TaskList|Task list]]

Interferometer Sensing and Control


Objective of the working group

  • To Establish a Robust and Low-Noise Sensing-Control Scheme for the LCGT Interferometer.

About the ISC group and this Wiki page

ISC (Interferometer Sensing and Control) working group is a working group dedicated to the development of a sensing and control scheme for the LCGT. This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion.


Organization

Time frame

Task list

LCGT/subgroup/ifo/ISC (last edited 2015-03-16 18:44:41 by KeikoKokeyama)